My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-117
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2016 2:20:57 PM
Creation date
9/30/2015 10:41:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/03/2007
Control Number
2007-117
Agenda Item Number
11.J.3
Entity Name
The Danella Companies
Subject
Change Order #1 Utility Conflict Resolutions
CR 512 Phase III Roadway Improvements
Area
CR 512 and CR 512
Supplemental fields
SmeadsoftID
6240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> _ Indian River County Department of Utilities <br /> DEDUCTIONS ADDITIONS, <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Attachment <br /> C �yya � „ � <br /> Project: CR 512 Phase III Roadway Improvements . Revised July 21, 2006 A 1. LR 111 11 _ 1- <br /> Description: Utility Relocations <br /> 31-.Iul-06 LABOR COSTS _ <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor <br /> Item No. Description Quantity Measure Price Price 1 - <br /> 4% 9 <br /> 77 Mobilization 1 $ ,387 .07 <br /> - _. <br /> 78 Demobilization 1 1 % $2,346.77 <br /> 79 Maintenance of Traffic l l % $2,346.77 <br /> Bid Item Il-3 Sewer Pipe 8" DIP 134 LF _ <br /> __ <br /> 32d Install 8" DIP Force Man 0.1LF $9.50 $ 1 ,273.00 <br /> ecan <br /> 7a Install-Mechanical Restraint Joint on Existing 8" Main 5.0 <br /> 5.0 EA $333 .00 $ 1 ,665.00 <br /> 09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00 <br /> - - _ <br /> 23 Test Holes/Potholes 4 EA $200.00 $800.00 $60000 ' <br /> _ - Bid Item L44 - Sewer Pipe 10" DIP 110 LF - - - - - <br /> 32d --- Install 10" DIP Force Main 110.0 LF $ 10.80 $ 1 , 188.00 <br /> Mechanica <br /> traint Joint on <br /> ing <br /> 3,000.00 <br /> 70; Install. ---Make <br /> Hol s/o Existi glMainO'-l2" Main FA $795 .00 $795.00 <br /> $11 EA $200. 00 $200.00 l $1 ,000.00 <br /> Bid Item U-5 - SewerPipe 10" HDPE (Directional Bore) LOM0 LF 1 I <br /> 0Install 10" DPEhorizontal Directional Drill 1 ,050.0 LF $25.00 $29400.00 - - - - -- ! - <br /> Install Mechanical Restrained Joint Fittings 0.50 "fON $1 ,665.00 $832.50 <br /> 066 <br /> 76 Install Mechanical Restraint Joint on Existing 10'- 12" Main 4.0 EA $500.00 $2,000.00 <br /> 09 Make Connection to Existing Main 2 .0 EA $795.00 $ 1 ,590.00 ' <br /> 19c Install 10" NRS Plug Valve & Box 2 EA $635.00 $ 1 ,270.00 -$ 1 ,200.00 <br /> 23 Test holes/Potholes 10 8A $200.00 $2,000.00 <br /> -__- - ---- - - <br /> 496 Install 2" Air Release Valve with ARV Manhole & Structure 2 EA $400.00 $800.W -$800.001 ' <br /> Rid Item U-6 - Sanitary 10" Plug W/Valve Box and Concrete 1 EA I ' <br /> 19e Install 10" NRS Plug Valve & Box I EA $635.001 $635.00 -$635.00 t i <br /> T 1 <br /> Bid Item U-7 - Sanitary 8" Plug w/Valve Box and Concrete Pad 1 EA <br /> 19d ' Install 5" NRS Plug Valve & Box I FA $48000 $480.00 -$480.00 <br /> - -Bio Item U-8 - Sanitary Sewer Air Release Manhole (4' wide) 2 EA <br /> Already Included in Pricing for J-5 10" Directional Bole 2 .0 EA $0.00 $0.00 <br /> _ Bid Item U-9-- Air-Relief Valve 2 EA <br /> Alread Included in Pricing tor 10" Directional Bore <br /> Y b 2.0 GA $0.00 50.00 <br /> y <br /> t c _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.