Laserfiche WebLink
_ Indian River County Department of Utilities _ <br /> DEDUCTIONS ADDITIONS <br /> COST ESIIMATEa I CONTRACTOR'S ed July 21, LIST Attachment ___ . . <br /> _. . _-_ Attachment 6 . . <br /> Project: CR 512 Phase III RoadwayImprovements - Revised July 21, 2006 I i <br /> Description: Utility Relocations <br /> 31-Jul-06 ILABORCOSTS li <br /> 4-- <br /> Item <br /> . - ._ . <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor T <br /> Item Na _ Description QuantityMeasure Price Price <br /> _ . -y_ 1 y-____- - 2 EA <br /> Bid Item U-10 Sanitary Sewer Adjustment Ass 8" DIP <br /> Y P $3,400,400 00 <br /> 05c Install 8" HDPE b Oen Cut 40.0 LF $85.00 $3,400.00 _ <br /> (include e en <br /> 06 Install Mechanical Restrained joint Fittings 0.80 TON $ 1 ,665 .00 $ 1 ,332.00 <br /> 07a Install Mechanical Restrained Joints on Existing 3 8 Main q EA $333.00 $ 1 ,332.00 i _ I <br /> _ <br /> 09 Make Connection to Existing Main 4.0 EA $795.00 $3 , 180.00 <br /> -_ <br /> 23 Test Holes/Potholes 4 FA $200.00 $800.00 _ $800.00 _ <br /> Bid Item U-11 Sanitary Sewer Adjustment Assy 10" DIP 1 EA <br /> _ (include (4) 45 Bend) <br /> 05d Install 10" HDPE by Open Cut 26.0 LF $90.00 $2,340.00 F $2,340 00 ADDITIONAL SANTIARY SEWER _ <br /> 06 Install Mechanical Restrained Joint Fittings 0.50 TON $ 1 ,665.00 $832.50 $832. 50 ADJUSTMENT ASSEMBLY <br /> 76 Install Mechanical Restraint Joint on Existing 10'-12" Main 2.0 EA $500.00 $1 ,000.00 $ 1 ,000 00 NOT IN QUOTE I <br /> _ <br /> 09 Make Connection to Existing Main 2.0 EA $795.00 $ 1 ,590.00 $ 1 ,590.00 ,__ - h <br /> 23 Test Holes/Potholes 0 EA $200.00 $0.00 _ _ $800.0O �, REQUIRED POTHOLES NOT IN <br /> ORIGINAL QUOTE <br /> Rid Item U-12 Sanitary Sewer Adjustment Assy 12" DIP i ! <br /> (include (4) 45 Bend) 3 EA <br /> OSe Install 12" HDPE by Open Cut 78 .0 LF $95 .00 $7,410.00 $5, 100.001 additional line stop required west of bridge <br /> OG Install Mechanical Restrained Joint Fittings 1 .95 1 TON $ 1 ,665 .001 $3,246.75 <br /> 7b Install Mechanical Restraint Joint on Existing 10'- 12" Main 6.0 EA $500.00 $3,000.00 _ <br /> 09 Make Connection to Existing Main 6.0 EA $795.00 $4,770.00 - <br /> 23 Test Holes/Potholes 6 EA $200.00 $ 1 ,200.00 <br /> Bid Item U-13 - Sanitary Sewer Fittings 8" x 10" Increaser 1 EA <br /> O6 Install Mechanical Restrained Joint Fittings O. 13 TON $1,665.00 $216.45 -$216.45 <br /> Bid Item U-14 - Sanitary Sewer Fittings 8" 45 Bneml 1 EA <br /> 06 Install Mechanical Restrained Joint Fittings 0.22 TON $1 ,665.00 $366.30 -$366.30 <br /> Bid Item U-15 - Sanitary Sewer Fittings 10" 45 Bend 1 EA <br /> pG _ Install Mechanical Restrained Joint Fittings 0.69 TON $ 1 ,665.00 $ 1 , 148.85 -$1 , 148.851 <br /> _ _ . <br /> Bid Item U-16 - Sanitary Sewer Fittings 12" 45 Bend 1 EA <br /> _ 06 Install Mechanical Restrained loin[ Fittings 0.84 TON $1 ,665.00 $ 1 ,398 .60 $2,940.00 <br /> Bid Item 11-18 - Potable Water Main 8" DIP 254 LF <br /> __ <br /> 2d Install 8" DIP Water Main 254.0 LP $9.60 $2,438 .40 <br /> __ . ___ <br /> 7a Install Mechanical Restraint Joint on Existing8" Main 11 .0 EA $333 .00 $3,663 .00 _ <br /> 0 ) Make Connection to Existing Main 1 .0 EA $795.00 $795.00 _ <br /> 23 "I est Holes/Potholes I EA 1 $200.001 $200.00 1 $200.00 _ ADDITIONAL POTHOLES REQUIRED <br />