My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-221
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:50:42 PM
Creation date
9/30/2015 9:49:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/20/2006
Control Number
2006-221
Agenda Item Number
7.J.
Entity Name
Timothy Rose Contracting
Subject
Change Oder No. 1 for 4th. Street Widening
Area
US 1 to Old Dixie Hwy
Supplemental fields
SmeadsoftID
5695
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY , FLORIDA -7 <br /> CHANGE ORDER NO . 1 <br /> C�)N' 0 () � <br /> PROJECT: 4th Street Widening - US1 to Old Dixie Highway DATE ISSUED : 6 / 20 /06 <br /> CONTRACTOR: Timothy Rose Contracting , Inc. <br /> 1360 SW Old Dixie Highway, Suite 106 <br /> Vero Beach , FI . 32962 <br /> ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE <br /> NO. PRICE INCREASE DECREASE <br /> 1 Clear Sod from East Pond LS 1 $1 ,450.00 $ 1 ,450.00 <br /> 2 Add Sand & Regrade East Pond LS 1 $2,300.00 $2,300.00 <br /> 3 Add #57 Stone East Pond LS 1 $530.00 $530.00 <br /> 4 Drain, Remove Silt, Add Sand & Regrade W. Pond LS 1 $5,440.00 $5,440.00 <br /> 5 Install 4" PVC Orifice In Weir LS 1 $155.00 $ 155.00 <br /> 6 REMAINING BALANCE IN FORCE ACCOUNT LS -1 $5,996.42 -$5,996.42 <br /> 102-99 VARIABLE MESSAGE BOARD ED -60 $65.00 -$3,900.00 <br /> 104-10 BALED HAY EA -60 $15.00 -$900.00 <br /> 110-7-1 MAILBOX (RELOCATE) EA -4 $100.00 7 <br /> 400.00 <br /> 120-4 Excavation (sub-soil) CY -95 $7.00 -$665.00 <br /> 286-1 -1 TURNOUT CONSTRUCTION (ASPHALT) SY 62 $127.00 $7,823.20 <br /> 286-1 -2 TURNOUT CONSTRUCTION (6" conc.) SY 371 $24.50 $9,089.50 <br /> 334-2 TYPE SP-12.5 ASPHALT OVERBUILD TN -51 $82.00 -$4, 182.00 <br /> 425-10 YARD DRAIN EA 1 $400.00 $400.00 <br /> 430-11 -423 15" RCP LF -1 $27.00 -$27.00 <br /> 430-11 -425 18" RCP LF -1 $32.00 -$32.00 <br /> 430-11 -429 24" RCP LF -2 $53.00 -$106.00 <br /> 430-11 -433 30" RCP LF -2 $69.00 -$138.00 <br /> 430-11 -438 36" RCP LF -6 $98.00 -$588.00 <br /> 430-171 -23 HDPE PIPE CULVERT (15") LF -2 $19.00 -$38.00 <br /> 515-1 -2 HAND RAIL (ALUMINUM) LF -115 $50.00 -$5,750.00 <br /> 520-1 -10 CONCRETE CURB & GUTTER (TYPE F ) LF -180 $9.35 -$1 ,683.00 <br /> 521 -72-4 CONCRETE GRAVITY WALL, CLASS I CONC. CY -15 $450.00 -$6,750.00 <br /> 522-1 CONCRETE SIDEWALK (4" THICKNESS) SY -60 $21 .90 -$1 ,314.00 <br /> 550-74-2/4 RELOCATE EXISTING 4' CHAINLINK FENCE LF -20 $5.50 -$110.00 <br /> ff <br /> 575-1 /B SOD (BAHIA) SY 5,926V$160.00 <br /> $10,370.50 <br /> 575-1 /F SOD (FLORATAM) SY -1 ,889 -$5, 100.30 <br /> 715-2-115 CONDUIT (2" SCHEDULE 40 PVC) LF -100 -$400.00 <br /> 1643-700 VALVE BOX ADJUST / MODIFY) EA -2 -$200.00 <br /> 1693-800 WATER SERVICE (RELOCATE) EA -2 -$1 , 100.00 <br /> 711 -3 PAVEMENT MESSAGES (THERMO) EA i $160.00 <br /> SUBTOTAL $37,718.20 (539,379.72) <br /> NET CHANGE -$1 ,661 .52 <br /> ORIGINAL CONTRACT PRICE $1 , 120,673 .00 <br /> CURRENT CONTRACT PRICE $ 1 , 120,673.00 <br /> AS ADJUSTED BY PREVIOUS CHANGE ORDERS <br /> NET CHANGE IN CONTRACT PRICE {$ 1 ; 661 . 52 ) <br /> DUE TO THIS CHANGE ORDER <br /> NEW CONTRACT PRICE INCLUDING THIS CHANGE ORDER $ 1 , 119,011 .48 <br /> Change OrderNolAs 6/8/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.