My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-313
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 4:16:51 PM
Creation date
9/30/2015 10:01:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/12/2006
Control Number
2006-313
Agenda Item Number
14.A.2.
Entity Name
Barth Construction, Inc.
Subject
IRC Fire Station #5-Change Order No.2
Supplemental fields
SmeadsoftID
5818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" CHANGE ORDER Distribution to: <br /> ' AIA DOCUMENT G701 OWNER ?� <br /> ARCHITECT <br /> CONTRACTOR <br /> FIELD <br /> OTHER <br /> PROJECT: CHANGE ORDER NUMBER : 2 <br /> I . R.C . Fire Station #5 <br /> 6585 U .S. Highway 1 <br /> Vero Beach, FL 32967 <br /> INITIATION DATE: 8/30/06 <br /> TO (Contractor): <br /> F- ARCHITECT' S PROJECT NO : <br /> Barth Construction , Inc. <br /> 1717 Indian River Blvd. CONTRACT FOR: <br /> Suite 202A <br /> L Vero Beach, FL 32960 J CONTRACT DATE : <br /> You are directed to make the following changes in this Contract: <br /> Owner Direct Purchase From 6/26/06 —8/30/06. -$529823.90 <br /> See Attached <br /> Not valid until signed by both the Architect and Owner. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The Original (Contract Sum) (Guaranteed Maximum Cost) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2, 1437518 .00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$ 173 ,665 <br />:25 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was . . . . . . . . . . . . $ 11969, 852 . 75 <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (tnsFeased) (decreased) (unchanged) <br /> by this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . -$ 52 , 823 .90 <br /> The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 1 ,917,028. 85 <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> ARCHITECT CONTRACTOR OWNER <br /> Edlun ri n Binkley, Arch . Barth Construction Indian River Cottdlp. kot,, of Enter. <br /> 65 yal a vd ., Suite D 1717 Indian River Blvd. 184025 1h <br /> 46e& " , <br /> ' � <br /> V o ac Suite 202A Vero Beata; FL 32960 <br /> Vero Beach, FL 32960 <br /> BY: BY: BY A, ' <br /> DATE : DA September 12 , 2006 <br /> AIA DOCUMENT G701 * CHANGE ORDER * APRIL 1978 EDITION * AIA * 1978 <br /> THE AMERICAN INSII FUTE OI' ARCHI'II EC'rs, 1735 NEW YORK AVE., N. W., WASHINGTON, D.C . 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.