Laserfiche WebLink
00% <br />Change Order <br />Document G701TM - 2001 <br />PROJECT (Name anti address): <br />43rd Avenue Sub -Complex <br />43rd Avenue <br />Vero Beach, Florida <br />TO CONTRACTOR (Name and address): <br />Chilber Construction Co., Inc <br />905 16" Place <br />Vero Beach, Florida 32970 <br />CHANGE ORDER NUMBER: 002 <br />DATE: May 2, 2006 <br />ARCHITECT'S PROJECT NUMBER: 2102 <br />CONTRACT DATE: August 02, 2005 <br />CONTRACT FOR: New Construction <br />s -oto -ol <br />o7 L: <br />711 AL <br />A0 o to - /,5 v <br />OWNER: <br />ARCHITECT: <br />CONTRACTOR: <br />FIELD: ❑ <br />OTHER: ❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />Description Amount <br />Add laundry sink in HVAC area and add ice machine hookup with floor drain in covered stagea area <br />A. I - 17W Musics wall hung laundry sink <br />I - #49-241 Gerber laundry facet <br />I - Trap and supply <br />B. 1 - #ZN-415 Zurn 3" floor drain <br />I - Ice machine supply <br />The original (Contract Sum) was <br />The net change by previously authorized Change Orders <br />The (Contract Sum) prior to this Change Order was <br />The (Contract Sum) will be increased by this Change Order in the amount of <br />The new Guaranteed Maximum Price including this Change Order will be <br />$793.51 <br />Subtotal: $793.51 <br />Contractor's Fee: $158.70 <br />CHANGE ORDER TOTAL: $952.21 <br />$ <br />3,1 t6,305.00 <br />have been authorized <br />$ <br />66,981.38 <br />been agreed upon by both the Owner and <br />$ <br />3,183,286.38 <br />supersede the Construction <br />$ <br />952.21 <br />$ <br />3,184,238.59 <br />The Contract Time will be changed by zero ( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is June 23, 2006 <br />NOTE: This <br />Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized <br />by Construction Change Directive <br />until the cost and time have <br />been agreed upon by both the Owner and <br />Contractor, <br />in which case a Change Order is executed to <br />supersede the Construction <br />Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Donadio & Associates, Architects, P.A. <br />ARCHITECT (First name) <br />609 17th Street, Vero Beach, FI 32960 <br />ADDRESS ` <br />BY (Signature) \J <br />Anthony Donadio <br />(Typed name) <br />Chilberg Construction Co., Inc. <br />(T)ped name) y <br />DATE <br />Indian River County Board of County <br />Commissioners <br />OWNER (Firm name) <br />1840 25th Street. Vero Beach -Fl 32960 <br />DATE <br />A. Baird, County Administrator <br />Wane) <br />AIA Document G70lyd - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA* Document, or <br />any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This <br />document was produced by AIA software at 12:09:52 on 05/03/2006 under Order No.1000192296_1 which expires on 8/8/2006, and is not for resale. <br />User Notes: (3467484405) <br />Reviewed and Recommended for App oval: <br />.x,0 b,,), s%lo� �1., _5�F3 <br />W. FraFhe, General Servlces Director Jason Brown, Budget Director <br />