OSLO.& 43rd AVENUE <br /> CHANGE ORDER NO . 2 <br /> PAGE 2OF3 <br /> ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE PRICE <br /> NO . INCREASE DECREASE <br /> 41 711 -35-241 24" White ( Paint) 132 . 0 LF $2 . 44 $322 . 08 <br /> 42 711 -36-61 6" Yellow ( Paint) 7146 . 0 LF $0 . 68 $4 , 859 . 28 <br /> 43 711 - 36- 181 18" Yellow ( Paint ) 168 . 0 LF $ 1 . 88 $315 . 84 <br /> 44 730-88 Temporary Pumping Station - 1 EA . $ 91500 . 00 ( $9 , 500 . 00 ) <br /> 45 1544- 110- 16 Air Release Assembly (6" below ground ) - 1 EA $ 51150 . 00 ($5 , 950 . 00 ) <br /> 46 1613- 140- 126 20" DIP Water Main 7 LF $ 103 . 00 $721 . 00 <br /> 47 1643-700 Valve Box (Adjust & Modify) -2 EA $ 325 . 00 ( $ 650 . 00 ) <br /> 48 1648- 100 20" Line Stop -0 . 7273 EA $ 22 , 000 . 00 ( $ 16 , 000 . 60 ) <br /> 49 1649-800 Water Meter ( Relocate ) - 1 EA $ 950 . 00 {$850 , 00 ) <br /> 50 1692- 1 -20 Mechanical Joint Restraints ( 10" F . M . ) 2 EA $ 250 . 00 $500 . 00 <br /> 51 455-3-2 Pres . Conc. Piling Furnish ( 18" Sq ) -215 LF $ 45 . 00 ( $ 9 , 675 . 00 ) <br /> 52 455-4-2 Pres . Conc. Piling Driven ( 18" Sq ) - 17 LF $ 3 . 50 ( $59 . 50 ) <br /> 53 455- 17-2 Pile Splices ( 18" ) -5 EA $ 100 . 00 ($500 , 00 ) <br /> 54 455- 133- 1 Steel Sheet Piling (Temp . ) -2500 SF 1 $ 3 . 50 ( $ 8 , 750 . 00 ) <br /> 55 455-414- 12 Test Piles Driven ( 18") -25 LF $ 63 . 00 ( $ 1 , 575 . 00 ) <br /> 56 620- 1 - 12 Conduit ( Underground ) 149 LF $ 5 . 75 $856 . 75 <br /> 57 635- 1 - 11 Pull Box 3 EA $ 250 . 00 $750 . 00 <br /> 58 660- 1 - 105 Inductive Loop Detedtor (Type 5) - 13 EA $ 275 . 00 ($3 , 575 . 00 ) <br /> 59 660- 1 - 106 Inductive Loop Detedtor (Type 6 ) -5 EA $ 275 . 00 ( $ 1 , 375 . 00 ) <br /> 60 600- 1 - 109 Loop Detector(type 9 ) 7 EA $ 132 . 00 $924 . 00 <br /> 61 660- 1 - 110 Loop Detector ( type 10 ) 3 EA $ 344 . 00 $ 1 , 032 . 00 <br /> 62 670-5- 110 Actuated Solid State Controller Assembly - 1 AS $ 15 , 000 . 00 ($ 15 ; 000 . 00 ) <br /> 63 670-5- 110 Controller Assembly ( Econoline ) 1 EA $ 16 , 543 . 00 $ 16 , 543 . 00 <br /> to STA 318 +25 $0 . 00 <br /> 64 Remove Dead Tree on NW corner 1 . 0 LS $2 , 500 . 00 $29500 . 00 <br /> 65 Damaged Tire Lauren Ball 1 . 0 LS -$35 . 00 ( $35 . 00 ) <br /> 66 Damaged Rim & Tire Joseph Chiarella 1 . 0 LS -$ 17267 . 05 ( $ 1 , 267 . 05 ) <br /> 67 Force Account -0 . 0640 LS $40 , 000 . 00 ( $2 , 560 . 00 ) <br /> SUBTOTAL $42 , 589 . 29 ( $ 1373269 . 25 ) <br /> NET CHANGE ( $94 , 679 . 96 ) <br /> ORIGINAL CONTRACT PRICE/TIME $2 , 3479748 . 75 210 Calendar Days <br /> CURRENT CONTRACT PRICE/TIME AS ADJUSTED BY PREVIOUS CHANGE ORD $2 , 5029660 .40 300 Calendar Days <br /> NET CHANGE IN CONTRACT PRICE/TIME DUE TO THIS CHANGE ORDER ( $94 , 679 . 96 ) 139 Calendar Days <br /> NEW CONTRACT PRICE/TIME INCLUDING THIS CHANGE ORDER $2 ,407 , 980 . 44 439 Calendar Days <br /> ORIGINAL SUBSTANTIAL COMPLETION DATE August 8 , 2004 <br /> SUBSTANTIAL COMPLETION DATE AFTER THIS CHANGE ORDER March 25 , 2005 <br /> ENGINEER'S RECOMMENDATION : <br /> I have examined the above changes . They are necessary to satisfactorily complete the contract . <br /> The rice chan are reas nable and I recommend that the changes be made . <br /> g�oS. ._ <br /> Terry B . Tho pson , P . E . , Project Marger ate <br /> F:\PublicWorks\Capital Projects\Oslo 43rd\Change Order\Change OrderNo2.xls 8/26/2005 <br />