My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-253
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:17:01 PM
Creation date
9/30/2015 11:00:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/24/2007
Control Number
2007-253
Agenda Item Number
11.J.5
Entity Name
Poole and Kent Company of Florida
Subject
IRC North County Water Treatment Plant Expansion Phase II
Change Order No.2
Area
North County Water Treatment Plant
Project Number
2006012
Supplemental fields
SmeadsoftID
6433
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCD TARIFF ESTIMATE (UCD Tang Effective: 09GOI=X11 WRf DATE: 511612007 <br /> PROJECT: LOCATION liol NIH AVE <br /> msDESIGNER <br /> (13 , and <br /> tree MOF UNITS CHARGES LREOITS <br /> (1J3.12.a) Primary lateral riser1 ffromoverand nominationprintf, pad mounted transformer and trench wHM1 cable-incontluit <br /> not to exceed 150 feet far ntlials and 300 feet for loops. <br /> From Overhead Termination Paint From Existing Underground Termination Point <br /> (1.2.12.a.1) Single Phase Radial $6M.25 X cry NIA Use Loop Price X qty 5 <br /> (13.212.6.2) Two Phase Radial $1,429.34 X cry NIA Use Loop Prim X cry <br /> - <br /> (133d2.a.3) Three Phase Radial - 150KVA 5618.2] X qty NIA Use Loop Prim X qry <br /> (13.2.12.a.4) Three Phase Radial - 300 KVA $0.00x 1 cry NIA Use Loop Price X qty5 <br /> 113.2.12.a.5) Single Phase loop 51,772.08 X qty $1,101.00 X qty S - <br /> 113.2.12.a.6) Two Phase Loop $3,238.17 X qty $2,122.68 X qty E - <br /> (13.2.12.a.7) Three Phase Loop - 150 KVA 531610." X qty $2,046.85 X < city $ <br /> (13.2.12.a.7) Three Phase Loop - 300 KVA $1,909.57 X city $585.97 % :: city S - <br /> (13.2.12.b) Secondary deer and lateral, excluding bandhole or junction box, with connection to Applicant's Service cables <br /> no greater than 20 feet from Company dear pole. <br /> (132126.1) Small Single Phase NO TPX or smaller $412.27 X peruser f <br /> (13212.6.2) Large Single Phase larger than 410 TPX $710.52 X Farmer $ <br /> (13212.b.3) Small Three Pinaral OPX or smaller $55281 % per Haar $ - <br /> (13312.b.4) Large Three Phase larger than GO OPX $1,027.63 X rpernser 3 - <br /> (13.2.120 Small UG commercial services 160 Amp 120V 1125 Amp 1201240V per SPO 21010.4) <br /> (13.212c1a) 2 wim Win (120V) <br /> servo on acceInaccessiblble e <br /> woodpole <br /> pole <br /> $457.14 X perservlce <br /> (1.T213cib) 3wire (1201240V) service on accessible wood pole $494.25 X persi 3 <br /> (13212c2a) 3w�re (120V) seryrice an in ssblewootlpole $521 .19 X per serwce $ <br /> (13212c26) 3 wire We (120124011)V) serea inaccessible wood pole $469.18 X per eervce $ <br /> (13212c 3a) 2 We (120V) service ¢sets concrete pole $569.18 X per service $ <br /> (13212c36) 3wm (12W240V) semcern accessible concrete pole $513]3 X par servos 3 <br /> (13.].12.d) Hantlholes and Padmounted Secondary Junction Boxes, excluding connections. <br /> (1321241) Hantlholes <br /> (13.2.12d1a) Small 24- handhole $152AO X per HH S <br /> (13.2.12.tl 1 b) Intermediate 30' handhole $183.94 X : per HH f - <br /> (13.2.12.d 1 c) large 48 ' handhole $566.71 X : per HH $ - <br /> (13.2.12d2) Pad Mounted Junction Box lPM TX Dummy $1,430.36 X ; perboa $ - <br /> Cabinet M&S 06140000-7) <br /> (143.12.4.34) Pad Mounted Junction Cabinet (22 pod $4,854.35 X Opernabinet 0 <br /> J phase cabinet MSS 4161-01001 <br /> (13.212E.3.b) Tapping conductors Of more than 12 sets) $51.64 XOperset 0 <br /> (13.2.12.¢1 Primary Splice Box including splices and cable pulling setup <br /> (13.2.12.e.1) Single <br /> asePhase <br /> per box $999.80 X �Perbox <br /> (13.2.12 a 2) Two Phase per box $1,399.4 X per box 3 <br /> (13.2.12.e.3) Three Phase per box $1,531.54 X per box y <br /> (131 Additional installation charge for underground primary latents including trench and cableincontlud which exceeds <br /> the limits set in 13.2.12.a to reach FPL designated point of delivery. <br /> (13.2.1211) Single Phase per fool $1.70 X peril. <br /> (1321212) Two Phase For <br /> $1.46 X peril 3 <br /> (1J 2121.3) Three Phase per foot $3.81 X 190 perit. E 723.90 <br /> (13.2.12.8) Additional installation charge for underground primary laterals including trench and cable-in-conduit extended <br /> beyond the FPL designated point of delivery. <br /> (13312g.1) Single Phase perfool Ser ft <br /> (132129.2) TwoPhasePhase Far fol Si4.60 X Per ft 3 <br /> (13212.g.3) TM1ree Phase Far foot $10.04 X per it 5 <br /> (13.2.12.1h) UG Feeder <br /> (13212h) 1000 KCMIL (not including switch package) $11.56 X <br /> Per ft 5 <br /> (13212Switch package J913 per package) $20,365.35 XEHqch $ - <br /> (13.2.121H <br /> hH Switch package 1616 per package) $20,365.35 % each S - <br /> ifA , is <br /> (13.2.13.a) Trench and bacMilling credits <br /> (13.2.13.a.1) Credit per fool of primary trench $2.27 % �perft $ 41 .60 <br /> it 3.2.13a.2) Credit per foot of secondary trench $2.11 X perf . $ - <br /> 113.2.13.61 Conduit installafion credits <br /> 1132.13.6.11Cditper1oo4rf2 PVC $0.39 % per it <br /> 113.2.13.b.21Cmd Pootof 5'derfPVC $0.55 X SM per It <br /> (13.2.13.c) Handbole I primary splice box installation credits <br /> (13213.c.1) Credit per Urge HH (gmater than 30 ') I PH Splice Box $151.71 % .` HH(s) 5 <br /> (13.2.13.c.2) Credit per small ) intermediate Hit (30- or less) $39.08 X HH(s) <br /> 113.2.13.41 Transformer) cap bank pad installation credits <br /> (13.2.13.4) Creditper "d $23,46 % padH) <br /> II 'i ." _ _ It <br /> Feeder Spice Box Cretld (FDRSPUCEBOX-07-060) $575.55 % ea h $ <br /> Fairmount Switch Chamber Credit (FDRSWPAM7460) $360.32 %each <br /> Additional Charges (eg non-npitl trenching, restoration, etc.) 0 <br /> TOTAL CONTRIBUTION: $ 733.80 <br /> LESS TOTAL CREDITS: 3 958.60 <br /> TOTAL CASH PAYMENT I E 23a.90 <br /> TOTAL CUSTOMER PAYMENT Rz�� <br /> (CONTRIBUTION MAT [ LABOR) <br /> (Miscellaneous Trench Purchase must be used if credits exceed total contribution amount Inventory on work request see SPO 21450.2) <br /> mlrzpn7 r:n Pm (CONTRIBUTION CASH) <br />
The URL can be used to link to this page
Your browser does not support the video tag.