Laserfiche WebLink
SAM St . - Johns River <br /> Water Management District <br /> Kirby B . Green III , Executive Director • David W. Fisk . Assistant Executive Director <br /> 4049 Reid Street • P. O . Box 1429 Palatka , FL 32178 - 1429 ( 386 ) 329 - 4500 <br /> On the Internet at wwwsjrwmd. com , <br /> CHANGE ORDER <br /> DATE : November 29 , 2005 CONTRACT/PURCHASE ORDER NUMBER : SG323AA <br /> vlark Order No. Change Order No. 2 <br /> CONTRACT NAME : Alternative Water Supply Cost Sharing Program <br /> TO : Michael Hotchkiss , P. E . <br /> Indian River County Utilties <br /> 1840 25th Street <br /> Vero Beach , FL 32960 <br /> FROM : Elizabeth Thomas , Project Manager <br /> PROJECT NAME : Indian River County RO concentrate reuse <br /> ACCOUNT NUMBER : 76-39 - 11 -6220- 8301 -04002 <br /> CHANGE ORDER IMPACTS : This change order will not impact the cost of the project or the reimbursement <br /> amount for the cost-share award recipient . <br /> JUSTIFICATION FOR EXTENSION : This contract concerns building a structure through which stormwater <br /> will pass into the storage area . A time extension is needed because Indian River County has been having <br /> discussions with the Florida Department of Environmental Protection (FDEP) about including the reuse of <br /> reverse osmosis reject water in addition to the stormwater for which the project was originally planned. Indian <br /> River County would like to maximize its reuse by blending reverse osmosis reject water with other sources <br /> rather than disposing of it through deep well injection . The reuse of this reject water requires a surface water <br /> storage area . <br /> Storing and using brine reject water in this manner is unusual in Florida. Consequently , FDEP is unfamiliar <br /> with permitting such activities and has been extremely careful about preventing potential adverse environmental <br /> impacts from this project . Considerable time and effort has been required to assure FDEP that the project will <br /> not have such impacts . A meeting between Indian River County and FDEP on November 16 , 2005 , resulted in <br /> substantial progress towards resolving the permitting issues . The project scope may require amendment if <br /> FDEP permits the addition of the brine reject water . Otherwise , Indian River County will proceed with the <br /> stormwater reuse project as originally planned . <br /> ----- - --- -- - -- ----------- GOVERN 1 N G BOARD ---- ------- - - -- <br /> David G . Graham ,. CHAIRMAN, John G . Sowinski , VICE CHAIRMAN Ann T. Moore , SECRETARY Duane L . Ottenstroer.. TREASURER <br /> JACKSONVILLE OR'_ANDO BUNNELL JACKSONVILLE <br /> R . Clay Albright Susan N . Hughes William W. Kerr Ometrias D. Long W. Leonard Wood <br /> OCALA PONTEVEDRA MELBOURNE BEACH APOPKA FERNANDINA BEACH <br />