My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-449B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-449B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2016 9:23:45 AM
Creation date
9/30/2015 11:34:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/18/2007
Control Number
2007-449B
Agenda Item Number
14.A.1
Entity Name
Barth Construction, Inc.
Subject
Change Order No. 3 Fire Station #2
Area
3301 Bridge Plaza Drive
Supplemental fields
SmeadsoftID
6771
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i L! " <br /> CHANGE ORDER Distribution to: ; <br /> AIA DOCUMENT G701 OWNER <br /> ARCHITECT _ <br /> CONTRACTOR _ <br /> FIELD _ <br /> OTHER — Donadio <br /> PROJECT: CHANGE ORDER NUMBER: 3 <br /> I . R.C. Fire Station #2 <br /> 3301 Bridge Plaza Drive <br /> Vero Beach, FL 32963 <br /> INITIATION DATE : 11 /29/07 <br /> TO (Contractor): <br /> 1 ARCHITECT' S PROJECT NO: <br /> Barth Construction, Inc. <br /> 1717 Indian River Blvd. CONTRACT FOR: <br /> Suite 202A <br /> L Vero Beach, FL 32960 J CONTRACT DATE: <br /> You are directed to make the following changes in this Contract: <br /> Owner Direct Purchase To Date Through 11 /29/07 - See Attached. <br /> P.O. Balance Tax Total <br /> IRC P.O. #00045477-00 TAW, Inc. $36,000.00 $25210 .00 $38,210.00 <br /> -538,210.00 <br /> Reverse Remaining Balance On The Owner Direct Purchase P.O. — See Attached. <br /> P.O. Balance Tax Total <br /> IRC P.O. #00045209-00 Rosen Materials $3,601 .41 $252. 10 $3 , 853 .51 <br /> $3.853.51 <br /> Total of Change Order -$34,356.49 <br /> Not valid until signed by both the Architect and Owner. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The Original (Contract Sum) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2, 549,221 .00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$ 198,073 <br />. 73 <br /> The (Contract Sum) GUaFanteed Maximum rest` prior to this Change Order was . . . . . . . . . . . . $2,351 , 147.27 <br /> The (Contract Sum) (Guaf '"'t ed " ...-. : ...um Cost` will be (increased) (decreased) (unehatged) <br /> b( this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .g . . . . . . . . . . . . . . <br />. . . . -$ 34,356.4 g <br /> The new Contract Sum includingthis Change Order will be $2,3161790. <br /> The Contract Time will be ( increased) (decreased) (unchanged) by ( ) Days <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> ARCHITECT CONTRACTOR OWNER <br /> Edlund, Dritenbas, Binkley, Arch . Barth Construction Indian River County Dept. of Emer. <br /> 65 Royal Palm Pointe, Suite D 1717 Indian River Blvd. 1840 25`h Street <br /> Vero Beach, FL 32960 Suite 202A Vero Beach, FL 32960 <br /> ZZ Vero Beach, FL 32960 Sandra L . Bowden , Chairman <br /> BY: kZ4 L2 BY: BS' Otty <br /> DATE : - E: r) DATE : <br /> AIA DOCUMENT 6701 • HANGE ORDER ' APRIL 1978 EDITION ' AIA ' 1978 <br /> THE AMERICAN INSTITUT F ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.