My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-405
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:15:45 PM
Creation date
9/30/2015 10:23:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/21/2006
Control Number
2006-405
Agenda Item Number
14.A.1.
Entity Name
Barth Construction, Inc.
Subject
IRC Fire Station #5-Change Order No. 3
Area
6585 US Hwy 1
Supplemental fields
SmeadsoftID
5973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G <br /> s . CHANGE ORDER Distribution to: <br /> AIA DOCUMENT G701 OWNER X C C ` r <br /> ARCHITECT _ <br /> CONTRACTOR <br /> FIELD <br /> OTHER <br /> PROJECT: CHANGE ORDER NUMBER : 3 <br /> I . R.C. Fire Station #5 <br /> 6585 U . S . Highway 1 <br /> Vero Beach, FL 32967 <br /> INITIATION DATE : 10/30/06 <br /> TO (Contractor) : <br /> 1— 7 ARCHITECT' S PROJECT NO: <br /> Barth Construction, Inc. <br /> 1717 Indian River Blvd . CONTRACT FOR: <br /> Suite 202A <br /> L Vero Beach, FL 32960 J CONTRACT DATE: <br /> You are directed to make the following changes in this Contract: <br /> Owner Direct Purchase From 10/6/06 — 10/30/06. -$279198.25 <br /> See Attached <br /> Not valid until signed by both the Architect and Owner. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The Original (Contract Sum) (Guaranteed Maximum Cost) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2, 143 ,518 . 00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$ 226,489. <br />15 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was . . . . . . . . . . . . $ 017,028 . 85 <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (inereused) (decreased) (ttnehenged) <br /> by this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . -$ 27, 198 .25 <br /> The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 1 ,889,830. 60 <br /> The Contract Time will be ( increased) (decreased) (unchanged) by ( ) Days <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> ARCHITECT CONTRACTOR OWNER <br /> Edlund, Dritenbas, Binkley, Arch . Barth Construction Indian River County Dept. of Enter. <br /> 65 Royal Palm Blvd., Suite D 1717 Indian River Blvd. 1840 25th Stt <br /> Vero Beach, FL 32960 Suite 202A Veto. atgl, 5132960 <br /> Vero Beach, FL 32960 <br /> 4 <br /> BY: BY BYr' eL <br /> " Ga . C WheelP Chairman <br /> DATE : to it �' E : �I3� o�' DATE . , GVftber - 21 , 2006 <br /> AIA DOCUMrNT G701 ' CHANGE ORDER + APRIL 1978 EDITION ' AIA + 1978 <br /> THE, AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N. W., WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.