Change Order
Approved Date
06/07/2005
Control Number
2005-188
Agenda Item Number
7.O.
Entity Name
Jobear Warden Construction, Inc.
Subject
East Roseland Stormwater Improvements Change Order No.3 Fencing
Project Number
0110
Supplemental fields
SmeadsoftID
4967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY - 18 - 2005 ( WED ) 11 : 22 warden ( FRX ) 3217285619 P 003 / 006 <br /> CHANGE ORDER NO . 003 <br /> DATE OF ISSUANCE : 6 / 7 , 2005 EFFECTIVE DATE : 6 / 7 , 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR: JOBEAR / WARDEN CONSTRUCTION , INC. <br /> Project: EAST ROSELAND STORMWATER IMPROVEMENTS <br /> OWNER's Project No . 0110 <br /> OWNERIENGINEER : Indian River County <br /> You are directed to make the following changes in the Contract Documents : <br /> 1 . Description : Increase the unit price contract amount for Bid Item No. 13 . 01 4 ' high <br /> chain link fence) by a total amount of $4.09 per lineal foot for a total unit price of $ 19 . 09 <br /> per lineal foot. Bids were received on June 2 , 2004 , but the construction contr4c ct was <br /> not awarded until December 8 , 2004 and costs escalated significantly during th it time. <br /> The project was delayed because the deletion of the north stormwater pond required a <br /> new SJRWMD permit, which was not issued until December 7 , 2004. The unit price <br /> increase represents the escalation of material cost since the project bid date , b t it <br /> does not include any increase in labor costs. <br /> 2. Description : Increase the unit price contract amount for Bid Item No . 13 .02 12' wide <br /> — 4' high gates) by $ 184 .93 per gate for a total unit price of $ 1047 . 93 per gate. Bids <br /> were received on June 2 , 2004 , but the construction contract was not awarded until <br /> December 8, 2004. The project was delayed because the deletion of the north <br /> stormwater pond required a new SJRWMD permit, which was not issued until <br /> December 7 , 2004 . The cost increase represents the escalation of material since the <br /> project bid date , but it does not include any increase in labor costs. <br /> INCREASE in Contract Price = 3 gates ' _ $ 184 . 93 increase per gate = $554 , 79 <br /> 3. Description : Decrease the amount of fence installed by 700 feet. Rather than run <br /> the entire length of the easterly property line , the fence will tie into a fence already <br /> installed along that boundary line by The Horne Depot. <br /> DECREASE in Contract Price: <br /> (a) Fence cost with new unit price amount = 1820 LF ` $ 19 .09/LF = $34, 7 3. 80 <br /> (b) Deduct 700 LF of fence = 700 LF * $19 . 09 = ($ 13 ,363, 00) <br /> Revised fence cost = $34 , 743 .80 • $ 13 ,363 . 00 = $21 ,380 .80 <br /> Fence cost per original Contract = $27 ,300 . 00 <br /> Therefore , DECREASE in original Contract Amount for fence = $271300 - <br /> $21 ,380. 80 $5 ,919 .20 <br /> SUMMARY OF CONTRACT DECREASE : <br /> (a) Increase in original Contract Amount for gates = $554 . 79 <br /> (b) Decrease in original Contract Amount for fence = $5 , 919. 20 <br /> (c) Net DECREASE in original Contract Amount = $5 , 919 .20 - $554. 79 = $ , 364.41 . <br /> Change Order #003 <br /> Change Order - 1 <br /> PIPublic WorksWeithmstormweter Prolects`Roseland%Change OrderslChange Order #003.doc <br />