My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-304
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 4:39:43 PM
Creation date
9/30/2015 10:00:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/12/2006
Control Number
2006-304
Agenda Item Number
7.L.
Entity Name
Lucas Marine Construction, LLC
Subject
Oslo Road/Lateral "J" Canal Bridge Replacement-Change Order #4
Supplemental fields
SmeadsoftID
5808
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br /> CHANGE ORDER NO. 4 J O y <br /> PROJECT NO: 9705B PROJECT: Oslo Road/Lateral "J" Canal <br /> CONTRACTOR: Lucas Marine Construction, LLC Bridge Replacement <br /> 3130 SE Slater Street ORIGINAL NTP: 25-Jan-06 <br /> Stuart, FL 34997 DATE ISSUED: 23-Aug-06 <br /> ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE PRICE <br /> NO. INCREASE DECREASE <br /> 1 Remove and reinstall 60" RCP 1 LS <br /> $8,875.00 $8,875.00 ` $0.00 <br /> 2 Install junction box 1 LS $12,550.00 $12,550.00 • $0.00 <br /> 3 Thrustb1mking 1 LS $1 ,765.00 $1 ,765. 00 $0.00 <br /> 4 530-34 Riprap 281 .57 TN $ 198. 00 $55,750.86 $0.00 <br /> 5 1600-900 Watermain Removal 165 LF $58.75 $9,693.75 <br /> $0. 00 <br /> 6 102-14 Traffic Control Officer 1 LS $6,000.00 $0. 00 $6,000. 00 <br /> 7 1204 Subsoil Excavation 143 CY $36.00 $0.00 $5, 148.00 <br /> 8 173-74 Cement (Pressure Grouting) 22.5 CY $500.00 $0.00 $11 ,250.00 <br /> 9 430-11 -338 Concrete Pipe Culvert (SS) (Class III) (361) 24 LF $230.00 $0.00 $5,520.00 <br /> 10 522-1 Sidewalk Concrete (4" Thick) 184 SY $39. 50 $0.00 $7,268.00 <br /> 11 575-1 -1 Sad (Bahia) 6571 SY $2.00 $0.00 $13, 142.00 <br /> 6" Yellow Skip Traffic Stripe (6'-10' Skip) <br /> 12 711 -34 (Thermoplastic) 146 LF <br /> $0.60 $0. 00 $87.60 <br /> 13 711 -35-61 6" White (Solid) (Thermoplastic) 2050 LF <br /> $0.44 $0.00 $902.00 <br /> 14 711 -35-241 24" White (Solid) (Thermoplastic) 12 LF $4. 06 $0.00 $48.72 <br /> 15 711 -36-61 6" Yellow (Solid) (Thermoplastic) 3800 LF $0.44 $0.00 $1 ,672.00 <br /> 16 1612-190-821201" PE WM (SDR 11 ) 55 LF $270.00 $0.00 $14,850.00 <br /> 17 1613-140-12 20" DIP WM 60 LF $150. 00 $0.00 $9,000.00 <br /> SUBTOTAL $88,634.61 $74,888. 32 <br /> NET CHANGE $13,746.29 <br /> ORIGINAL CONTRACT PRICEITIME $2, 188,848.87 <br /> ORIGINAL SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 25-May-06 120 Calendar Days <br /> ORIGINAL SUBSTANTIAL COMPLETION DATE 24-Jul-06 180 Calendar Days <br /> ORIGINAL FINAL COMPLETION 23-Aug-06 210 Calendar Days <br /> CHANGE ORDER NO. 1 $36, 905.00 <br /> CHANGE ORDER NO. 2 $17, 157.50 <br /> CHANGE ORDER NO. 3 $18,265.00 <br /> CURRENT CONTRACT PRICE/TIME $2,261 , 176.37 <br /> CURRENT SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 8-Jun-06 14 Calendar Days <br /> CURRENT SUBSTANTIAL COMPLETION DATE 24-Jul-06 0 Calendar Days <br /> CURRENT FINAL COMPLETION 23-Aug-06 0 Calendar Days <br /> NEW CONTRACT PRICE/TIME INCLUDING $2,274,922.66 <br /> SUBSTANTIAL COMPLETION DATE (Bridge-Culvert) AFTER THIS CHANGE OR 8-Jun-06 0 Calendar Days <br /> ORIGINAL SUBSTANTIAL COMPLETION DATE AFTER THIS CHANGE ORDER 24-Jul-06 0 Calendar Days <br /> FINAL COMPLETION AFTER THIS CHANGE ORDER 23-Aug-06 0 Calendar Days <br /> ENGINEER'S RECOMMENDATION: <br /> I have examined the above changes. They are necessary to satisfactorily complete the contract. The price changes are reasonable and I <br /> recommend that the \ag s be made. <br /> e -Zo <br /> Janet B. Dunlap, P. .APro gine D e <br /> CONTRACTOR'S APPROV J <br /> I agree that the above ch s ' s i ont in acco lth Specifications forte price changes shown, are satisfactory. <br /> Z3 06 <br /> ade Diekman, Vice-President D to <br /> Lucas Marine Construction, LLC <br /> F1Public WorkMCapital Projects\Oslo Road Lateral J\Lucas MannelChange Orders and Work Change Directives\Work Change 2_BCCMemo.doo 8/232006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.