Laserfiche WebLink
Summit Construction Management, Inc. CGCO58845 <br /> 3200 43" Ave. Suite 11 , Vero Beach, FL 32960 <br /> PROPOSAL TO: Indian River County Utilities Dept. <br /> PROJECT NAME: IRC Utility Operations Complex <br /> PROJECT ADDRESS: 4375 43 `d Avenue, Vero Beach <br /> PROPOSAL DATE: March 31 , 2006 <br /> The scope of this proposal will include the following: <br /> Per Owner' s direction, revise the lift station per the attached. Extra costs associated with the are <br /> preparatory work for future pump #3 (when added, Owner will only need to purchase pump, drop <br /> into wet well and connect electric) and increased quantity of concrete due to revised layout. All <br /> other items on attached list are no-cost changes. <br /> Add piping, plumbing, posts for future pump – material $ 6,840.00 <br /> Add piping, plumbing, posts for future pump – labor $ 35800.00 <br /> Add 1 ,000 SF of 6" concrete paving $ 4,500.00 <br /> Subtotal $ 159140.00 <br /> Contractor' s Fee $ 2%271 .00 <br /> TOTAL $ 17,411,00 <br /> 5— <br /> Summit Construction Management, Inc. will provide the above scope of work for a total <br /> proposed cost of: <br /> TOTAL PROPOSAL COST: $ 17,411 .00 <br /> Please sign below if proposal is a��ccepjjted <br /> Date 5� <br /> Payment will be due 10 days after invoice date. <br /> Phone (561) 794-2099 Fax (561) 794-2097 <br />