Laserfiche WebLink
Summit Construction Management, Inc. CGO058845 <br /> 3200 43`d Ave. Suite 11 , Vero Beach, FL 32960 <br /> PROPOSAL TO: Indian River County Utilities Dept. <br /> PROJECT NAME : IRC Utility Operations Complex <br /> PROJECT ADDRESS : 4375 43`d Avenue, Vero Beach <br /> PROPOSAL DATE: April 18, 2006 <br /> The scope of this Proposal will include the following: <br /> Due to uncovered existing conditions, the force main at the East portion of the lift station project <br /> will require design modifications. See the attached cost breakdown from our site work <br /> subcontractor. <br /> Subcontractor cost $ 105880.00 <br /> Restoration $ 11400.00 <br /> Contractor' s Fee $ 1 842.00 <br /> TOTAL $ 14,122.00 <br /> Summit Construction Management, Inc. will provide the above scope of work for a total <br /> proposed cost of. <br /> TOTAL PROPOSAL COST: $ 14, 122.00 <br /> Please sign below if roop�osal is accepted — �^ <br /> Co� Date O 1.7 - 06 <br /> Payment will be due 10 days after invoice date. <br /> Phone (561 ) 794.2099 <br /> Fax (561) 794.2097 <br />