My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-177
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 2:10:05 PM
Creation date
9/30/2015 9:43:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/23/2006
Control Number
2006-177
Agenda Item Number
11.J. 1.
Entity Name
Summit Construction Management, Inc.
Subject
Utilities Operations Complex
Supplemental fields
SmeadsoftID
5646
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summit Construction Management, Inc. CGO058845 <br /> 3200 43`d Ave. Suite 11 , Vero Beach, FL 32960 <br /> PROPOSAL TO: Indian River County Utilities Dept. <br /> PROJECT NAME : IRC Utility Operations Complex <br /> PROJECT ADDRESS : 4375 43`d Avenue, Vero Beach <br /> PROPOSAL DATE: April 18, 2006 <br /> The scope of this Proposal will include the following: <br /> Due to uncovered existing conditions, the force main at the East portion of the lift station project <br /> will require design modifications. See the attached cost breakdown from our site work <br /> subcontractor. <br /> Subcontractor cost $ 105880.00 <br /> Restoration $ 11400.00 <br /> Contractor' s Fee $ 1 842.00 <br /> TOTAL $ 14,122.00 <br /> Summit Construction Management, Inc. will provide the above scope of work for a total <br /> proposed cost of. <br /> TOTAL PROPOSAL COST: $ 14, 122.00 <br /> Please sign below if roop�osal is accepted — �^ <br /> Co� Date O 1.7 - 06 <br /> Payment will be due 10 days after invoice date. <br /> Phone (561 ) 794.2099 <br /> Fax (561) 794.2097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.