Laserfiche WebLink
vull i , vV V1. VV�! VIII mLy / / L / y4LVtlI P .L <br /> bL <br /> Summit onstruction Management, Inc . <br /> Summ g CGCA58845 <br /> 320043rd Ave .1Suke 11 , Vem Beach, Ft. 32960 <br /> i <br /> PROPOSAL TO: Indian River County <br /> PROJE& NAME: I.R. C. Utilities Operations Complex #UCP 2229 <br /> PROJEC'� ADDRESS: 4350 41 "` Street, Vero Beach <br /> PROPOSAL DATE: June 19, 2006 <br /> The scopeof this proposal will include the followinz: <br /> COST REMAINING IN ALLOWANCE ITEMS, FOR CREDIT CHANGE ORDER TO <br /> OWNER: <br /> Line Item #5 Permit Allowance $ 7,500. 00 Allowance <br /> Actual coc f 6. 103 .29 <br /> Cost remaining, credit to Owner $ 1 ,396.71 <br /> Line Item #8 Change Directive Allowance $94,600. 00 <br /> Actual cost, Change Directive #1 — 30 94214.48 <br /> Cost remaining, credit to Owner $ 385.52 <br /> Summit Construction Management, Inc. will provide the above scope of work for a total <br /> proposed cost of: <br /> TOTAL PROPOSAL COST: $ -11782.23 <br /> ago r/.�S 8 ( z4lOfD <br /> Phone (561) "H4.2099 Fa (561) 794-2097 <br />