Laserfiche WebLink
Summit Coustruction Management, Inc. CGCW 1841 <br /> :3200 48' .1ve, Suite 11 , Vu'o Bexh, FL 32960 <br /> PROPOSAL TO : IRC <br /> PROJECT NAME : Utility Complex <br /> PROJECT ADDRESS: 4350 4154 St <br /> PROPOSAL DATE : Aug 2 2006 <br /> The scope of this proposal will include the following: <br /> Remove and replace 18 ea East Palatka. Holly trees and 9 ea Magnolia trees with larger than <br /> specified trees. This cost represents the difference between the originally specified trees and the <br /> cost for the new larger trees. Include labor to remove original trees. <br /> Summit Construction Management, Inc. will provide the above scope of work for a total <br /> proposed cost of: <br /> TOTAL PROPOSAL COST: 53,402.00 �`/ <br /> Pease - ign b � • rr�ny!--�"'"— tn1Z.� S "` 24 �� � <br /> Yhone 0t; 1 ) 7N-200.9 Fav 15611 771.:LYW <br /> Zd L60Zb6LZLL Aisuun e7e 1n nn F V <br />