Laserfiche WebLink
uli laic duo _V I ; a rAA 'r rz you YiII PRECISION PALLING <br /> 4 ' 0 003 <br /> Precision Paving & Excavation, Inc . <br /> Mailing address: Phonc: 772-068-1313 <br /> 8430 Hidden Pines Road Phone: 772-873-0538 ; js <br /> Locffitd @ 2800 Kings Hvry. Fax: 772-468-1071 <br /> FL Picrcc, FL 34945 Email: prccP9V@be11sou1h_= Precision,Paying <br /> 3ammry 13 , 2#0S <br /> George: Fisher <br /> Chilbelg Construction Company <br /> Phone: (772) 978- 1707 <br /> Fax (772) 978- 1709 <br /> Rx: Request for Change Order <br /> Dear George: <br /> Our original bid was $20, 510.00 for approximately 382 linear feet ofpipe <br /> and 3 manholes. Approximately $53 .69 per foot including manholes. <br /> Our new cost with the work order change is $78,925 .00 for approximately 1 ,370 <br /> linear kiet of pipe @ $53 . 69 per foot ($73,925 .00) and 3 manholes. <br /> We estimate it will lake vs 5%o- 10%4 longer to install the Pipe in the new location <br /> 20' -30' from edge of the pavement. Maneuvering equipment in that space slows us <br /> down a bit, also we may need to do some maintenance oftraflic and the pipe and sewer <br /> manholes are deeper than the original depth. <br /> If we use the conserrative side of the 5%-10% additional time, say 6%o and <br /> administrative fees bring this cost to : <br /> $ 73, 555 .00 Total <br /> x 1 .06% Tax <br /> $ 77,968.00 <br /> + 957 . 00 Addtl_ Admin Fees <br /> $ 78,92S.9B <br /> We feel we are beirl;; conservative because with the new depth there is a chance <br /> we may need to do additional well pointing as well. Due to our desire to maintain a good <br /> solid working relationship with Cbiliberg Construction we are approximately $5,000.00 <br /> less than we probably should be, <br /> Sincerely, <br /> Sam Brink <br /> Precision Paving & Excarmion, Inc. <br /> Received Time Jan . i3 . 1 : 58PM <br />