<br /> Document G701TM - 2001 1% tRAlLSERVICt"
<br /> Change Order
<br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 004 OWNER:
<br /> 43rd Avenue Sub-Complex DATE: May 16, 2006 ARCHITECT:
<br /> 43rd Avenue
<br /> Vero Beach, Florida CONTRACTOR:
<br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 FIELD: ❑
<br /> Chilber Construction Co., Inc CONTRACT DATE: August 02, 2005
<br /> 905 16"i Place CONTRACT FOR: New Construction OTHER: ❑
<br /> Vero Beach, Florida 32970
<br /> THE CONTRACT IS CHANGED AS FOLLOWS:
<br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
<br /> Description: Amount
<br /> Excavate and install 2 inch conduits with pull strings from the stub outs in Buildings I & 2 of the 43`a Avenue Sub
<br /> Complex and run to underground pullboxes at southerly property line and backfill the excavated ditch. $ 7,315 .27
<br /> Exchange robelini palms for sable palms It 65 .00
<br /> Credit for projection screens $ (600.00)
<br /> Subtotal : $ 6,780.27
<br /> Contractor's Fee: $ 1 ,002.53
<br /> CHANGE ORDER TOTAL: $ 7,782.80
<br /> The original (Contract Sum) was $ 3, 116,305.00
<br /> The net change by previously authorized Change Orders $ 133,515.00
<br /> The (Contract Sum) prior to this Change Order was $ 3,249,820.00
<br /> The (Contract Sum) will be increased by this Change Order in the amount of $ 7,782.80
<br /> The new Contract Sum including this Change Order will be $ 3,257,602.80
<br /> The Contract Time will be changed by thirty ( 30 ) days.
<br /> The date of Substantial Completion as of the date of this Change Order therefore is July 23, 2006
<br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
<br /> have been authorized by Construction Change Directive until the cost and time have beemagreed upon by both the Owner and
<br /> Contractor, in which case a Change Order is executed W supersede the Construction Change Directive.
<br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
<br /> Donadio & Associates, Architects, P.A. Chilberg Construction Co., Inc. Indian River County Board of County
<br /> Commissioners
<br /> ARCHITECT (Firm name) CONTRACTOR iEirm
<br /> ',n me OWNER (Finn name)
<br /> 609 17th Street, Vero Beach, F132960 905 16'" � c , Vt� _ ch, FI 32960 - 1840 25th Street, Vero Beach,FI 32960
<br /> ADDRESS �n�al
<br /> . ADDRE ADDRESS
<br /> +-�
<br /> BY (Signature) X BY (Signature) ,� ( ignaM e)
<br /> Anthony Donadio Steve Chilberg, P?ot idene seph A. Baird, County Administrator
<br /> (Typed name) (Typed nramer, 'yped name)
<br /> p§. u, . p*, .5 30 •- 1)L
<br /> DATE DATE DATE
<br /> Reviewed an commended for Approval :
<br /> - o S 30 6i
<br /> Lynilliams, Project Manager Thomas W Frame, acral Services irect r Ja n Bro n,
<br /> Document G701 TM' — 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All right reserve WARNING: This
<br /> AIA° Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or disn"i tion oft s AIA0 Document, or
<br /> any portion of it, may result in severe civil and criminal penaitles, and will be prosecuted to the maximum extent po ible der the law. This
<br /> document was produced by AIA software at 17:1018 on 06/16/2006 under Order No. 1000192296_1 which expires on 8/8/20 d is not for resale.
<br /> User Notes: (2145644022)
<br />
|