My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-396
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:29:43 PM
Creation date
9/30/2015 10:18:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/14/2006
Control Number
2006-396
Agenda Item Number
7.O.
Entity Name
Chilberg Construction Co., Inc.
Subject
43rd. Avenue Sub-Complex-Change Order No.006
Supplemental fields
SmeadsoftID
5956
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY ADMINISTRATION COMPLEX <br /> TLC PROJECT NUMBER 503036 <br /> MAY 185 2006 <br /> ATRIUM SMOKE CONTROL <br /> PAGE 5 OF 6 <br /> ENGINEERING <br /> FOR Aft OfFTECTJAE <br /> OPERATION SEQUENCE <br /> Activation <br /> Initiate smoke control activation from FACP , as follows: <br /> 1 . On a signal from the fire alarm panel due to activation of one automatic smoke <br /> detection device within atrium . <br /> 2 . Activation of duct smoke detection device within unit AHU -2- 1 -1 <br /> 3 . Activation of duct smoke detection device within unit AHU-2-2-1 <br /> 4 . Activation of duct smoke detection device within unit AHU-2-2-2 <br /> 5 . Activation of automatic sprinkler water flow with building . <br /> 6 . Manual activation through the fire alarm panel . <br /> Deactivation <br /> Deactivation of smoke control mode shall be manual , through the fire alarm control <br /> panel . <br /> Control Sequence <br /> Upon activation , the following shall occur in sequence : <br /> 1 . Fire alarm control panel ( FACP) signals security system which shall release and <br /> power open doors 101A, 101 B , 101C <br /> 2 . FACP verify doors open on end switches <br /> 3 . FACP de-energizes AHU -2- 1 -1 , AHU-2-2- 1 and AHU -2-2-2 fan <br /> 4. FACP signals damper EF-2-2-3 to open <br /> 5. FACP signals EF-2-2-3 to energize. <br /> 6 . FACP signals damper EF-2-2-4 to open <br /> 7 . FACP signals EF-2-2-4 to energize . <br /> 8 . FACP provides indication of system in operation <br /> Test Mode <br /> Provide capability manually override sequence for testing of individual components . <br /> Trouble Alarm <br /> Trouble alarm on end switch proof when system is in smoke evacuation mode <br />
The URL can be used to link to this page
Your browser does not support the video tag.