Laserfiche WebLink
r <br /> SURVEY <br /> Stake-out LS 1 $3,700 . 00 $31700 . 00 0 .00% $0 .00 <br /> Monuments (Lots/PCP's) LS 1 $2,200 . 00 $2,200 . 00 100 . 00% $2 ,200 .00 <br /> As-builts LS 1 $31000 . 00 $37000 . 00 100 . 00% $32000 . 00 <br /> Subtotal $89900.00 58 .43 % $59200.00 <br /> LANDSCAPING/IRRIGATION <br /> Landscaping* LS 1 $ 103800 . 00 $ 10, 800. 00 100 . 00% $ 102800 , 00 <br /> Irrigation LS 1 $ 1300 . 00 $ 13 , 680 . 00 100 . 00% $ 137680 . 00 <br /> * I 00' of 25 ' Wide Type C Buffer <br /> 800' of 25 ' Wide Type D Buffer Subtotal $249480.00 100 . 00% $249480.00 <br /> ENGINEERING <br /> Inspections LS 1 $32000. 00 $32000. 00 100 . 00% $350000 . 00 <br /> Certification LS 1 $ 1 ,000 . 00 $ 11000 . 00 100 . 00% $ 1 , 000 . 00 <br /> Subtotal $49000.00 100 . 00% $49000.00 <br /> TOTAL CONTRUCTION COSTS <br /> ROADWAY/RIGHT-OF-WAY $55,368.25 100 . 00% $555368.25 <br /> DRAINAGE $389401.00 0 . 00% $0.00 <br /> WATER $399048.75 10 . 00% $3,904.88 <br /> SEWER $45,433.50 ' 13 .27% $61028.35 <br /> MISCELLANEOUS $109606.80 74 . 54% $7,906.80 <br /> SURVEY $8,900.00 58 . 43 % $59200.00 <br /> LANDSCAPING/IRRIGATION $249480.00 100 . 00% $249480. 00 <br /> ENGINEERING $4,000.00 • 100 . 00% $49000.00 <br /> TOTAL $2269238.30 47 .25% $106,888. 28 <br /> PLUS 15% $33,935.75 $169033.24 <br /> GRAND TOTAL . $260,174.05 $122,921.52 <br /> Prep and ceby: <br /> � Date: �7' - 3 ' cF3 <br /> jodA B. Bittle, P.E. <br /> FAe8. No. 57396 <br />