Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
� e e <br /> . 15 inspect and perform minor maintenance of condensate <br /> pump at flare station , <br /> . 16 recommending or implementing solutions to manage gas <br /> migration , and <br /> . 17 conducting opacity testing ( Method 22 ) annually for the <br /> flare , in accordance with the Title V permit requirements ; <br /> and <br /> . 18 recommending or implementing any other procedure that <br /> is necessary for safe operation of the landfill gas control <br /> system . <br /> 2 . 4 . Contractor will prepare and submit a written monthly <br /> summary report for the District to be used in the <br /> District ' s reporting to the regulatory agency . The <br /> monthly summary will include the tabulated monitoring <br /> results recorded for that month , problems encountered and <br /> solutions implemented , adjustments made to the wellfield or <br /> flare system , and general maintenance performed on the <br /> system . <br /> Task 3 - Non - Routine Scheduled and Emergency Maintenance <br /> 3 . 1 Non - routine activities consist of services that , due <br /> to the nature of the activity , can be scheduled at a time <br /> convenient to the District or , because of the potential <br /> damage to public health and / or the environment , must be <br /> completed immediately ( emergency ) . <br /> 3 . 1 . 1 . Non - routine scheduled services consist of response <br /> to major corrective repair or maintenance work identified <br /> during the routine visits . Non - routine scheduled work <br /> could include items such as : follow - up monitoring related <br /> to regulatory agency notifications ; response to excessive <br /> blower vibration , repair of rigid , above grade piping ; and <br /> any repair of flare station components , including <br /> condensate sump pump damage due to electrical surge , <br /> outages ; and construction maintenance . Construction <br /> maintenance is defined as repair / replacement of subsurface <br /> gas collection system components , including , but not <br /> limited to : repair of broken or leaking piping ; repair of <br /> condensate sumps ; replacement of extraction wells or <br /> monitoring probes ; localized settlement regrading which <br /> results in condensate entrainment . This work is essential <br /> to achieving the Landfill gas system operational goal ; <br /> however , it is considered work that can be scheduled to <br /> allow for efficient procurement of materials , rental of <br /> equipment , and scheduling of additional personnel that may <br /> 14 <br />