My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-160
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 3:50:39 PM
Creation date
9/30/2015 6:37:51 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 . Specifications SECTION 1 . 2 . 4 - MAINTENANCE OF ON - SITE <br /> FACILITIES AND OTHER RESPONSIBILITIES . Both subparagraphs <br /> of paragraph d of Specifications Section 1 . 2 . 4 are hereby <br /> modified in their entirety as follows : <br /> d . Roads , Drives , and Parking Areas . Contractor shall <br /> perform all repair , replacement , patching , and other work <br /> required to maintain the Class I all - weather site access <br /> road from the scale house to the west fence ; Segment 1 <br /> access road , and all other Class I ancillary drives and <br /> parking areas in optimum operating condition at all times . <br /> Contractor shall maintain the permanent all - weather road on <br /> the Landfill surface including necessary repairs and <br /> restoration of all - weather surface ; repair and restoration <br /> of the base ; repair and restoration of drainage facilities ; <br /> and other operations necessary to provide at all times a <br /> riding surface free from major distortion and capable of <br /> supporting the loaded waste hauling vehicles . The <br /> permanent all weather road shall be : i ) designed to <br /> accommodate transfer tractor trailers of up to 80 feet <br /> long ; and ii ) expanded at the sole cost of Contractor , by <br /> no later than August 1 , 2003 . Contractor acknowledges and <br /> agrees that the permanent all weather Landfill roads shall <br /> be able at times to accommodate such 80 foot trailers . In <br /> addition , Contractor acknowledges and agrees that the <br /> moveable temporary tipping area shall be , at all times <br /> during which such moveable temporary tipping area is <br /> operational , an all - weather moveable temporary tipping area <br /> of sufficient size , strength , and stability to accommodate <br /> transfer tractor trailers of up to 80 feet long . The <br /> Contractor shall take any and all reasonable precautions to <br /> control particulate emanating from these surfaces . <br /> Contractor may utilize pallets , clean debris as defined in <br /> 62 - 701 . 200 ( 15 ) FAC , and similar inert material to provide <br /> all weather access to the tipping area . <br /> 17 . The background recitals are true and correct and form <br /> a material part of this Amendment . <br /> 18 . All terms and provisions of the Contract not amended <br /> by this Amendment shall be and remain in full force and <br /> effect . <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.