My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-025
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:12 AM
Creation date
9/30/2015 11:55:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-025
Agenda Item Number
7.L.
Entity Name
Clear Zone Maintenance
Subject
Oslo Road Clearing 43rd Ave. Clearing
Area
31st. Ave.SW -43rd. Ave. 6th Pl. SW - South Relief Canal
Bid Number
2008013
Supplemental fields
SmeadsoftID
6846
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEFECTIVE WORK AND MATERIALS. <br />` All materials furnished or work done, when not in accordance with the intent of these Specifications, shall <br />be rejected and shall be removed immediately and replaced by suitable and satisfactory work and <br />materials. Failure to reject any defective work or materials will not prevent later rejection when such a <br />defect is discovered and shall not relieve the CONTRACTOR of his obligation to fulfill his contract even <br />though such work and materials have been previously inspected by the OWNER and accepted; it shall not <br />,.l.l:,...s.. 41.e nl1r MI) r.. f....,1 ..r�n..o .. ol.all ii n ..t tl,o M'AMMP or��r t:mP CIJNQanllP"f 4iInm <br />_ vuusuw Ula v YT _u w •ua... aCwF....ua......Or �........ t.reVe... ..... .........I :n ,...� »,,.....I»..... . <br />recovering damages from work actually shown to be defective within a one (1) year period after the final <br />acceptance. <br />r <br />If the CONTRACTOR fails to remove any defective work or materials, the OWNER shall have the right <br />to stop work and remedy the cause at the expense of the CONTRACTOR. <br />If the OWNER deems it expedient to accept minor imperfect work, the OWNER shall have the right to <br />retain such work and an equitable deduction shall be made in the Contract price. <br />DAMAGE TO THE WORK. <br />Until final acceptance of the work by the OWNER, it shall be under the charge and care of the <br />CONTRACTOR and he shall take every necessary precaution against injury or damage to the work by the <br />action of the elements, or from any other cause whatsoever. The CONTRACTOR shall rebuild, repair, <br />restore and make good, at his own expense, damages to any portion of the work before its completion and <br />.. acceptance. <br />FINAL CLEANUP. <br />Before the work is considered complete, al l rubbish and unused material due to, or connected with, the <br />work must be removed and the premises left in a condition satisfactory to the OWNER. Al l property, <br />public or private, disturbed or damaged, during the execution of the work shall be restored to its former <br />condition. Final payment will be withheld until such work is accomplished. <br />SAFETY AND PROTECTION <br />Safety. The CONTRACTOR shall furnish and install all necessary equipment and facilities for the <br />protection of the workers and the safety of the public and shall carry on this work in a manner best <br />calculated to avoid injury to the public or to the workers. <br />Protection of Adjacent Property and Utilities: The CONTRACTOR shall conduct his work in such a <br />manner as to avoid damage to adjacent private or public property and shall immediately repair or pay for <br />any damage incurred through his operations. The CONTRACTOR shall take cognizance of al l existing <br />utilities and he shall operate with due care in the vicinity of such utilities and shall immediately repair or <br />have repaired at no additional costs to the OWNER any breakage or damage caused by his operation. <br />` Should the OWNER be required to make such repairs, the cost of such repairs shall be deducted from the <br />contract price. <br />END SPECIAL PROVISIONS <br />7 <br />Page 12 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.