My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-025
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:33:55 PM
Creation date
9/30/2015 11:55:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-025
Agenda Item Number
7.L.
Entity Name
Clear Zone Maintenance
Subject
Oslo Road Clearing 43rd Ave. Clearing
Area
31st. Ave.SW -43rd. Ave. 6th Pl. SW - South Relief Canal
Bid Number
2008013
Supplemental fields
SmeadsoftID
6846
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEFECTIVE WORK AND MATERIALS. <br /> ` All materials furnished or work done, when not in accordance with the intent of these Specifications , shall <br /> be rejected and shall be removed immediately and replaced by suitable and satisfactory work and <br /> materials. Failure to reject any defective work or materials will not prevent later rejection when such a <br /> defect is discovered and shall not relieve the CONTRACTOR of his obligation to fulfill his contract even <br /> though such work and materials have been previously inspected by the OWNER and accepted; it shall not <br /> ,.l.l : ,...s.. 4' nl1r MI) r.. f... .,1 ..r�n ..o .. ol. all ii n ..t tl, o M'AMMP or�� r t:mP CIJNQanllP"f 4iInm <br /> _ vuusuw Ula v YT _ u w •ua.. . aCwF. ...ua.... ..Or �...... . . t.reVe... ..... .. . . . .... I :n ,...� »,, .....I».... . . <br /> recovering damages from work actually shown to be defective within a one ( 1 ) year period after the final <br /> acceptance. <br /> r <br /> If the CONTRACTOR fails to remove any defective work or materials, the OWNER shall have the right <br /> to stop work and remedy the cause at the expense of the CONTRACTOR. <br /> If the OWNER deems it expedient to accept minor imperfect work, the OWNER shall have the right to <br /> retain such work and an equitable deduction shall be made in the Contract price . <br /> DAMAGE TO THE WORK. <br /> Until final acceptance of the work by the OWNER, it shall be under the charge and care of the <br /> CONTRACTOR and he shall take every necessary precaution against injury or damage to the work by the <br /> action of the elements, or from any other cause whatsoever. The CONTRACTOR shall rebuild, repair, <br /> restore and make good, at his own expense, damages to any portion of the work before its completion and <br /> .. acceptance . <br /> FINAL CLEANUP. <br /> Before the work is considered complete, al l rubbish and unused material due to, or connected with, the <br /> work must be removed and the premises left in a condition satisfactory to the OWNER. Al l property, <br /> public or private, disturbed or damaged, during the execution of the work shall be restored to its former <br /> condition. Final payment will be withheld until such work is accomplished. <br /> SAFETY AND PROTECTION <br /> Safety. The CONTRACTOR shall furnish and install all necessary equipment and facilities for the <br /> protection of the workers and the safety of the public and shall carry on this work in a manner best <br /> calculated to avoid injury to the public or to the workers. <br /> Protection of Adjacent Property and Utilities: The CONTRACTOR shall conduct his work in such a <br /> manner as to avoid damage to adjacent private or public property and shall immediately repair or pay for <br /> any damage incurred through his operations . The CONTRACTOR shall take cognizance of al l existing <br /> utilities and he shall operate with due care in the vicinity of such utilities and shall immediately repair or <br /> have repaired at no additional costs to the OWNER any breakage or damage caused by his operation. <br /> ` Should the OWNER be required to make such repairs, the cost of such repairs shall be deducted from the <br /> contract price . <br /> END SPECIAL PROVISIONS <br /> i <br /> Page 12 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.