Laserfiche WebLink
rrs <br /> 4 . CLEARING AND GRUBBING <br /> A Payment for Clearing and Grubbing shall include compensation for: the ` <br /> removal and disposal of asphaltic concrete and existing concrete <br /> pavement , concrete , sidewalks , curbing , abandoned utilities ( including i <br /> pipes , cables , conduit and structures ) , existing walls , riprap , various types <br /> of fences , septic tanks , drain fields , pump stations , motor boxes , pumps , <br /> irrigation apparatus , base material , trimming of trees and shrubs , drainage <br /> structures , pipe , backfilling the removal excavations , plus all other items <br /> necessary to be removed to construct the project . All non -salvageable <br /> materials removed shall remain property of the Contractor unless <br /> otherwise directed by the Engineer or Owner. All unwanted materials <br /> shall be removed and suitably disposed of by the Contractor outside the <br /> project limits . Any salvage value received from the removed materials <br /> shall be reflected in the Contractor' s proposal . <br /> Be Clear and grub within the entire limits of the right-of-way except in specific <br /> areas designated by the Engineer to remain for aesthetic purposes . <br /> C . Existing and temporary asphaltic pavement and excess subsoil shall be <br /> disposed of outside the project by the Contractor , at a location and in a <br /> manner approved by the Engineer. <br /> D . Removal of existing pavement includes all removal and disposal of the .. <br /> asphalt within the limit shown on the plans . <br /> Existing artesian and non -artesian water wells located within the limits of <br /> the proposed roadway improvements shall be grouted and sealed in <br /> accordance with St . Johns River Water Management District Chapter 40C- <br /> 31 F . A . C . .. <br /> Cost of mailboxes shall include all labor to furnish and install and relocate <br /> due to construction phasing and materials required . <br /> G . Payment shall be made under: <br /> Item No . 4 - Clearing and Grubbing — Lump Sum .. <br /> 5 . EARTHWORK <br /> A . Earthwork , including earthwork for drives outside the right-of-way limits , <br /> shall be paid for as excavation and embankment . Cost shall include all <br /> work specified in this section and Section 120 of the Standard •. <br /> Specifications . Such price and payment shall specifically include all cost <br /> of any roadway , retention area or swale , and final dressing operations in <br /> accordance with Section 120- 13. 3 . ` <br /> Be Earthwork quantities shall be considered as in - place material with no <br /> shrinkage or expansion factors . •� <br /> TECHNICIAL PROVISION <br /> TP - 11 <br /> r <br />