My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br /> Where sodding is used in drainage ditches , the setting of the pieces shall <br /> be staggered so as to avoid a continuous seam along the line of flow. <br /> ., Along the edges of such staggered areas , the offsets of individual strips <br /> shall not exceed 6 inches . In order to prevent erosion caused by vertical <br /> edges at the outer limits , the outer pieces of sod shall be tamped so as to <br /> .. produce a featheredge effect. <br /> Where sodding is placed abutting paved shoulder, the contractor is to <br /> ensure that the finished sod elevation is 1 Y2' below paved shoulder. <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from <br /> sliding by means of wooden pegs driven through the sod blocks into firm <br /> earth , at suitable intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in <br /> .r the Engineer's opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> .. H . Watering : The areas on which the sod is to be placed shall contain <br /> sufficient moisture , as determined by the Engineer, for optimum results . <br /> After being placed , the sod shall be kept in a moist condition to the full <br /> AW depth of the rooting zone for at least 2 weeks . Thereafter, the Contractor <br /> shall apply water as needed until the sod roots and starts to grow for a <br /> minimum of 60 days (or until final acceptance , whichever is latest) . <br /> I . Maintenance : The Contractor shall , at his expense , maintain the sodded <br /> areas in a satisfactory condition until final acceptance of the project . Such <br /> 4W maintenance shall include repairing of any damaged areas and replacing <br /> areas in which the establishment of the grass stand does not appear to be <br /> developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor' s negligence , <br /> carelessness or failure to provide routine maintenance shall be at the <br /> Contractor' s expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance <br /> date as directed by the Engineer. Grass height shall not exceed 6" <br /> without mowing . Clippings shall be removed from sidewalk . <br /> J . Article 575-5 ( Page 669 ) . The first two paragraphs under this Article are <br /> deleted and the following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer <br /> (2 applications ) , sidewalk sweeping after mowing , mowing , disposal of <br /> clippings , water, tools , equipment , labor and all other incidentals <br /> necessary . <br /> M <br /> K . Payment shall be made under: <br /> Item No . 54 Sod ( Bahia ) - Per Square Yard <br /> Item No . 55 Sod ( Floratam ) - Per Square Yard <br /> TECHNICIAL PROVISION <br /> TP - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.