My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rrr <br /> Work in connection therewith (except in an emergency c. CONTRACTOR failed to give the <br /> as required by paragraph 6 . 16 .A), notify OWNER and written notice within the time and as re- <br /> ENGINEER in writing about such condition . quired by paragraph 4 .03 .A. <br /> CONTRACTOR shall not further disturb such <br /> condition or perform any Work in connection therewith 3 . If OWNER and CONTRACTOR are <br /> (except as aforesaid ) until receipt of written order to do unable to agree on entitlement to or on the <br /> so , amount or extent, if any, of any adjustment in <br /> the Contract Price or Contract Times , or both , a <br /> B . ENGINEER's Review. After receipt of written Claim may be made therefor as provided in <br /> notice as required by paragraph 4 .03 .A, ENGINEER paragraph 10 .05 . However, OWNER, <br /> will promptly review the pertinent condition , determine ENGINEER, and ENGINEER's Consultants <br /> the necessity of OWNER's obtaining additional shall not be liable to CONTRACTOR for any <br /> exploration or tests with respect thereto, and advise claims , costs , losses , or damages (including <br /> OWNER in writing (with a copy to CONTRACTOR) of but not limited to all fees and charges of <br /> ENGINEER's findings and conclusions , engineers , architects , attorneys , and other <br /> professionals and all court or arbitration or other '■" <br /> C . Possible Price and Times Adjustments dispute resolution costs) sustained by <br /> CONTRACTOR on or in connection with any <br /> 1 . The Contract Price or the Contract other project or anticipated project. 1.r <br /> Times, or both , will be equitably adjusted to the <br /> extent that the existence of such differing 4 . 04 Underground Facilities <br /> subsurface or physical condition causes an in- <br /> crease or decrease in CONTRACTOR's cost A. Shown or Indicated. The information and data •+ <br /> of, or time required for, performance of the shown or indicated in the Contract Documents <br />with <br /> Work ; subject, however, to the following : respect to existing Underground Facilities at or <br /> contiguous to the Site is based on information and <br /> a . such condition must meet any one or data furnished to OWNER or ENGINEER by the .r <br /> more of the categories described in para- owners of such Underground Facilities , including <br /> graph 4 . 03 .A; and OWNER, or by others . Unless it is otherwise <br /> expressly provided in the Supplementary Conditions : .. <br /> b . with respect to Work that is paid for <br /> on a Unit Price Basis , any adjustment in 1 . OWNER and ENGINEER shall not <br /> Contract Price will be subject to the be responsible for the accuracy or com- <br /> provisions of paragraphs 9 .08 and 11 .03 . pleteness of any such information or data; and <br /> 2 . CONTRACTOR shall not be entitled 2 . the cost of all of the following will be <br /> to any adjustment in the Contract Price or included in the Contract Price , and CONTRAC- .r <br /> Contract Times if: TOR shall have full responsibility for: <br /> a . CONTRACTOR knew of the a , reviewing and checking all such <br /> existence of such conditions at the time information and data , <br /> CONTRACTOR made a final commitment <br /> to OWNER in respect of Contract Price and b . locating all Underground Facilities <br /> Contract Times by the submission of a Bid shown or indicated in the Contract <br /> or becoming bound under a negotiated Documents , <br /> contract; or <br /> c. coordination of the Work with the <br /> b . the existence of such condition could owners of such Underground Facilities , <br /> reasonably have been discovered or including OWNER, during construction , and <br /> revealed as a result of any examination , <br /> investigation , exploration , test, or study of d . the safety and protection of all such <br /> the Site and contiguous areas required by Underground Facilities and repairing any <br /> the Bidding Requirements or Contract damage thereto resulting from the Work. <br /> Documents to be conducted by or for CON - <br /> TRACTOR prior to CONTRACTOR's B . Not Shown or Indicated <br /> making such final commitment; or <br /> 1 . If an Underground Facility is <br /> uncovered or revealed at or contiguous to the <br /> 0016-00700 - General Conditions <br /> Page 12 of 44 <br /> FAEngineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016-00700 - General Conditions.doc <br /> ttrrr <br />
The URL can be used to link to this page
Your browser does not support the video tag.