My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to lot or unit sales within the project served by the system , or upon completion of <br /> construction of the system , whichever occurs first . For those systems , which are proposed <br /> to be maintained by county or municipal entities , final operation and maintenance <br /> documents must be received by the District when maintenance and operation of the system <br /> is accepted by the local governmental entity . Failure to submit the appropriate final <br /> documents referenced in this paragraph will result in the permittee remaining liable for <br /> .. carrying out maintenance and operation of the permitted system . <br /> 9 . Each phase or independent portion of the permitted system must be completed in <br /> .. accordance with the permitted plans and permit conditions prior to the initiation of the <br /> permitted use of site infrastructure located within the area served by the portion or phase of <br /> the system . Each phase or independent portion of the system must be completed in <br /> accordance with the permitted plans and permit conditions prior to transfer of responsibility <br /> for operation and maintenance of that phase or portion of the system to local government or <br /> other responsible entity. <br /> 10 . Within 30 days after completion of construction of the permitted system , or independent <br /> portion of the system , the permittee shall submit a written statement of completion and <br /> certification by a registered professional engineer or other appropriate individual as <br /> authorized by law , utilizing As Built Certification Form 40C - 1 . 181 ( 13) or 40C - 1 . 181 ( 14) <br /> supplied with this permit . When the completed system differs substantially from the <br /> permitted plans , any substantial deviations shall be noted and explained and two copies of <br /> +� as - built drawings submitted to the District . Submittal of the completed from shall serve to <br /> notify the District that the system is ready for inspection . The statement of completion and <br /> certification shall be based on on -site observation of construction (conducted by the <br /> �. registered professional engineer, or other appropriate individual as authorized by law , or <br /> under his or her direct supervision ) or review of as- built drawings for the purpose of <br /> determining if the work was completed in compliance with approved plans and <br /> specifications . As- built drawings shall be the permitted drawings revised to reflect any <br /> changes made during construction . Both the original and any revised specifications must be <br /> clearly shown . The plans must be clearly labeled as " as- built" or " record " drawing . All <br /> surveyed dimensions and elevations shall be certified by a registered surveyor . The <br /> following information , at a minimum , shall be verified on the as-built drawings : <br /> 1 . Dimensions and elevations of all discharge structures including all weirs , slots , gates , <br /> pumps , pipes , and oil and grease skimmers ; <br /> 2 . Locations , dimensions , and elevations of all filter , exfiltration , or underdrain systems <br /> including cleanouts , pipes , connections to control structures , and points of discharge to the <br /> receiving waters ; <br /> .. 3 . Dimensions , elevations , contours , or cross-sections of all treatment storage areas <br /> sufficient to determine state-storage relationships of the storage area and the permanent <br /> pool depth and volume below the control elevation for normally wet systems , when <br /> aw appropriate ; <br /> 4 . Dimensions , elevations , contours , final grades , or cross-sections of the system to <br /> determine flow directions and conveyance of runoff to the treatment system ; <br /> 5 . Dimensions , elevations , contours , final grades , or cross -sections of all conveyance <br /> systems utilized to convey off-site runoff around the system ; <br /> 6 . Existing water elevation (s) and the date determined ; and Elevation and location of <br /> benchmark(s) for the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.