Laserfiche WebLink
r <br /> Project No . 0236) plotted October 6 , 2004 . One set of as-built plans for these <br /> projects shall be submitted to the District upon completion of the projects . <br /> 5 ) Adequate drainage in Sub-lateral A-6 Canal shall be maintained/provided during <br /> and following storm eventg throughout construction phase of these projects to <br /> prevent adverse flooding of affected properties in the canal sub-basin. <br /> The contractor shall contact Indian River Farms Water Control District <br /> Superintendent, David Gunter, to coordinate appropriate procedures to follow in <br /> ,. any temporary blockage of the canal during construction phase . <br /> d. <br /> r. <br /> JAMEC\SPEC COND-PROVISOS\special-cond-no. doc . 2 . <br />