Florida Erosion and Sediment Control Inspector's Manual <br /> Phase / <br /> This is the first construction related activity to occur on any site . Installation of initial controls <br /> shall be discussed at the pre-construction conference . The contractor and the inspector <br /> should understand the inspection and maintenance requirements of the specified BMPs , as <br /> well as the location and proper installation procedures . <br /> Offsite runoff should be diverted around the project if stabilized areas , adequate conveyance , <br /> and/or protected inlets are available . Sediment traps and basins should be built to receive <br /> the anticipated runoff and sediments . A temporary sediment basin in the location of the <br /> permanent stormwater facility makes efficient use of space and simplifies future tasks . <br /> Perimeter controls and diversions must be installed to keep sediments onsite and directed <br /> ., to the traps and basins . As clearing and grading progresses , temporary seeding and <br /> mulching should follow immediately for areas which will not be worked for a period of seven <br /> days or more . <br /> Phase 11 <br /> ,. This phase is the interim phase of the project . The permanent stormwater management <br /> system is constructed in conjunction with the other construction activities . Before runoff is <br /> directed into it, the system must be properly stabilized . Additionally it must be protected from <br /> .. sedimentation until completion of the project. As the stormwater facilities are constructed , <br /> they should also be kept free of sediments . Special care must be taken if stormwater ponds <br /> are used as temporary sediment basins to ensure complete removal of accumulated <br />•• sediments which would reduce stormwater storage volume and cause premature clogging . <br /> If possible , design and excavate the sediment basin bottom 6" to 12" ( 15 - 30 cm ) higher than <br /> the eventual pond bottom . Land disturbance should occur only in areas which are being <br /> actively worked . Graded areas should be seeded and mulched immediately if they will not be <br /> worked for a period of seven days or more . <br />.. A regular maintenance program should insure inspection and maintenance of BMPs by the <br /> contractor weekly and/or after significant rain events . Any failures should be analyzed to <br /> prevent recurrence . Substantial changes to the approved plan must be made or reviewed by <br /> r. the designer and approved by the appropriate regulatory agency. <br /> Phase I// <br /> This is the completed project. The entire stormwater management system should be built <br /> according to the approved plans . Substantial deviations from the plan may require revisions <br /> by the design professional , reapproval by the regulatory agency, and/or reconstruction by the <br /> contractor. The system must also function as designed and in compliance with applicable <br /> regulatory criteria . Any previously unforeseen activities which could compromise the function <br /> or maintainability of the system should be addressed immediately. <br /> 4-2 <br />