My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN iiiiiiiiiiiiiiiiiiiiiililill <br /> Florida Erosion and Sediment: Control Inspector's Manual <br /> Staked and Entrenched <br /> r Binding Wire Strew Eats <br /> or Twine <br /> Compacted Soil to <br /> Prevent Piping <br /> r Fftered Runoff Sediment Laden <br /> VOW Runoff <br /> tf 1l loll � I <br /> ^ t <br /> I = <br /> 1 Rill i II <br /> Properly Installed Straw Bale <br /> ,.. (Cross• Sectian) <br /> 1 . Excavate the Trench 2. Place and Staka Straw Bales <br /> e. <br /> Angle First Stake <br /> Toward Previously <br /> laid Me <br /> ✓� t M <br /> Flow <br /> Bale �r <br /> r . <br /> Width <br /> 1 ' <br /> k y <br /> 0 <br /> y <br /> 4. Backfill and Compactthe <br /> I Wedge Loose Strew Between Between Bales Excavated Soli <br /> Construction of Straw Bale Harrier <br /> Plate 4 .05b Construction of a Straw Bale Barrier <br /> Source : NRCS <br /> rr <br /> 4- 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.