Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual <br /> performs its function , the stone must be pulled away from the block, cleaned and <br /> replaced '. <br /> 7 . As an alternate, gravel filled burlap bags may be stacked tightly around the curb inlet. <br /> (See Plates 4 . 08n and 4 . 08o ) <br /> Curb and Gutter Sediment Barrier <br /> 1 . Place gravel filled burlap bags on gently sloping street segments according to the <br /> spacing chart . (See Plate 4 . 08p) .� <br /> 2 . Place two or more bags at each interval in a mannerwhich provides maximum support. <br /> rr <br /> 3 . When stacking several bags high , leave a one bag gap to provide an overflow spillway . <br /> (See Plate 4 . 08q ) <br /> ..r <br /> 4 . Sediments must be removed after each rain event. <br /> Maintenance •• <br /> 1 . The structure shall be inspected after each rain and repairs made as needed . <br /> 2 . Sediment shall be removed and the trap restored to its original dimensions when <br /> the sediment has accumulated to 1 /2 of the design depth of the trap . Removed <br /> sediment shall be deposited in a suitable area and in such a manner that it will not <br /> erode . <br /> 3 . Structures shall be removed and the area stabilized when the remaining drainage <br /> area has been properly stabilized . <br /> r <br /> 4-52 <br />