Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual ■" <br /> Maintenance <br /> The measure shall be inspected after every storm and repairs made to the dike , flow channel <br /> and outlet, as necessary. Approximately once every week, whether a storm has occurred or <br /> not, the measure shall be inspected and repairs made if needed . Damages caused by <br /> construction traffic or other activity must be repaired before the end of each working day. <br /> . .r <br /> Compacted Soil <br /> W Min . , . , . , . , . , , , . , , <br /> - , . 0 A Flow <br /> 4. 6' M i n. .. <br /> .r <br /> Plate 4. 15a Temporary Diversion Dike -- Source : Virginia oSwc <br /> 4-58 <br />