Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual <br /> Good timing is essential to fill construction . The filling operation should be completed as <br /> quickly as possible and the permanent slope protection measures and slope stabilization <br /> measures installed as soon after completion as possible . With quick and proper construction , <br /> the developer or contractorwill save both time and money in building , repairing and stabilizing <br /> the fill area. The longer the time period for construction and stabilization , the more prone the <br /> fill operation is to damages by erosion . Repairing the damages adds additional time and <br /> expense to the project. <br /> Design Criteria <br /> No formal design is required . The following criteria shall be met: <br /> Drainage Area <br /> The maximum allowable drainage area is 5 acres (2 ha) . <br /> Heigh <br /> T .■ <br /> The minimum height of the supporting ridge shall be 9 inches (23 cm ) . (See Plate 4 . 16a) . <br /> r <br /> Grade <br /> The channel shall have a positive grade to a stabilized outlet . .► <br /> Outlet <br /> +rr <br /> The diverted runoff should be released through a stabilized outlet , slope drain or sediment <br /> trapping measure . <br /> ■r <br /> Construction Specifications <br /> 1 . The diversion shall be constructed at the top of the fill at the end of each work day <br /> as needed . .■ <br /> 2 . The diversion shall be located at least 2 feet (60 cm ) inside the top edge of the fill . <br /> (See Plate 4 . 16a ) . . rr <br /> 3 . The supporting ridge of the lower side shall be constructed with a uniform height <br /> along its entire length . r" <br /> Maintenance <br /> Since the practice is temporary and under most situations will be covered the next work day, <br /> the maintenance required should be low. If the practice is to remain in use for more than one <br /> day, an inspection will be made at the end of each work day and repairs made to the measure <br /> if needed . The contractor should avoid the placement of any material over the structure while <br /> it is in use . Construction traffic should not be permitted to cross the diversion . <br /> ■r <br /> 4-62 <br /> .O <br />