My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual <br /> Spacing <br /> The following table will be used to determine the spacing of right-of--way diversions : <br /> % Slope Spacing in feet(m) <br /> Less than 5 % 300 (90 m ) <br /> Between 5 % and 10 % 200 (60 m ) <br /> Greater than 10% 100 (30 m ) <br /> Grade <br /> ow <br /> Positive drainage , with less than 2 % slope , should be provided to a stabilized outlet or <br /> sediment trapping facility. .., <br /> Outlet <br /> +rr <br /> Interceptor dikes must have an outlet which is not subject to erosion . The on -site location may <br /> need to be adjusted to meet field conditions in order to utilize the most suitable outlet . <br /> Concentrated flows should spread over the widest possible area after release . Flows with .. <br /> high sediment concentrations should pass througha sediment trapping measure . (See Plate <br /> 4 . 17b ) <br /> Construction Specifications <br /> 1 . The diversion shall be installed as soon as the right-of-way has been cleared • <br /> and/or graded . <br /> 2 . All earthen diversions shall be machine- or hand -compacted in 8-inch (20 cm) lifts . +� <br /> 3 . The outlet of the diversion shall be located on an undisturbed and stabilized area <br /> when at all possible . The field location should be adjusted as needed to utilize a <br /> stabilized outlet . Sediment laden flows shall be conveyed to a sediment trapping <br /> device . <br /> 4 . Earthen diversions which will not be subject to construction traffic should be slibkmd <br /> in accordance with TEMPORARY SEEDING - Section 6 . 65 ( ES BMP 1 .65) . <br /> .r <br /> Maintenance <br /> The practice shall be inspected after every rainfall and repairs made if necessary . .r <br /> Approximately once every week, whether a storm has occurred or not, the measure shall be <br /> inspected and repairs made if needed . Diversions which are subject to damage by vehicular <br /> traffic should be reshaped at the end of each working day . <br /> .r <br /> 4-66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.