My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections , tests , and approvals that the results 2 . changes in the Contract Price or <br /> certified indicate compliance with , the Contract Contract Times which are agreed to by the 'r'I <br /> Documents . parties , including any undisputed sum or <br /> amount of time for Work actually performed in <br /> E . The limitations upon authority and responsibil- accordance with a Work Change Directive; and <br /> ity set forth in this paragraph 9 . 10 shall also apply to <br /> ENGINEER's Consultants , Resident Project Repre- 3 . changes in the Contract Price or <br /> sentative , and assistants . Contract Times which embody the substance of <br /> any written decision rendered by ENGINEER <br /> ARTICLE 10 - CHANGES IN THE WORK; CLAIMS pursuant to paragraph 10 . 05 ; provided that, in <br /> lieu of executing any such Change Order, an <br /> appeal may be taken from any such decision in <br /> 10 . 01 Authorized Changes in the Work accordance with the provisions of the Contract <br /> Documents and applicable Laws and Regula- <br /> A. Without invalidating the Agreement and tions , but during any such appeal , <br /> without notice to any surety, OWNER may, at any time CONTRACTOR shall carry on the Work and <br /> or from time to time, order additions , deletions , or adhere to the progress schedule as provided in <br /> revisions in the Work by a Written Amendment, a paragraph 6 . 18 .A. <br /> Change Order, or a Work Change Directive . Upon .r <br /> receipt of any such document, CONTRACTOR shall 10 . 04 Notification to Surety <br /> promptly proceed with the Work involved which will be <br /> performed under the applicable conditions of the A. If notice of any change affecting the general <br /> Contract Documents (except as otherwise specifically scope of the Work or the provisions of the Contract •• <br /> provided). Documents (including , but not limited to , Contract <br /> Price or Contract Times) is required by the provisions <br /> B . If OWNER and CONTRACTOR are unable to of any Bond to be given to a surety, the giving of any <br /> agree on entitlement to, or on the amount or extent, if such notice will be CONTRACTOR's responsibility. <br /> .rr <br /> any, of an adjustment in the Contract Price or Contract The amount of each applicable Bond will be adjusted <br /> Times , or both , that should be allowed as a result of a to reflect the effect of any such change . <br /> Work Change Directive, a Claim may be made <br /> therefor as provided in paragraph 10 .05 . <br /> 10 . 02 Unauthorized Changes in the Work <br /> .Ir <br /> A. CONTRACTOR shall not be entitled to an <br /> increase in the Contract Price or an extension of the <br /> Contract Times with respect to any work performed nr <br /> that is not required by the Contract Documents as <br /> amended , modified , or supplemented as provided in <br /> paragraph 3 .04, except in the case of an emergency <br /> as provided in paragraph 6 . 16 or in the case of <br /> uncovering Work as provided in paragraph 13 .04 . B . <br /> 10 . 03 Execution of Change Orders <br /> A. OWNER and CONTRACTOR shall execute <br /> appropriate Change Orders recommended by ENGI- <br /> NEER (or Written Amendments) covering : <br /> 1 . changes in the Work which are : (i) <br /> ordered by OWNER pursuant to paragraph <br /> 10 .01 .A, (ii) required because of acceptance of <br /> defective Work under paragraph 13 .08 .A or <br /> OWNER's correction of defective Work under <br /> paragraph 13 .09 , or (iii ) agreed to by the <br /> parties ; <br /> r <br /> 0016-00700 - General Conditions <br /> Page 30 of 44 <br /> FAEngineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41 st St Contract Docs\0016-00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.