Laserfiche WebLink
.. SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC- 3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A . In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> .. 2 . Addenda <br /> 3 . Specifications <br /> 4 , Supplementary Conditions to the General Conditions <br /> 5 . General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 . Referenced Standards , <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4 . 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated 2/7/05 , prepared by A. M . Engineering and Testing , Inc. , <br /> entitled : A. M . Project No . D-04771 , consisting of 13 pages . The "technical <br /> " data" contained in such report on which CONTRACTOR may rely is <br /> permeability tests and soil borings . <br /> r� <br /> 0016-00800 - Supplementary Conditions <br /> 008002 <br /> FAEngineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016-00800 - Supplementary Conditions.doc Rev. 05/01 <br />