My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VW <br /> M . Upon return of a submittal marked " Revise and Resubmit" , make the •• <br /> corrections indicated and repeat the initial approval procedure . The " Not <br /> Approved " notation is used to indicate material or equipment that is not <br /> acceptable . Upon return of a submittal so marked , repeat the initial <br /> approval procedure utilizing acceptable material or equipment . <br /> N . Any related Work performed or equipment installed without an "Approved " <br /> or "Approved as Corrected " Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR . <br /> O . Submit Shop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved . CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings . Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P . ENGINEER will review and process all submittals promptly , but a <br /> reasonable time should be allowed for this , for the Shop Drawings being <br /> revised and resubmitted , and for time required to return the approved <br /> Shop Drawings to CONTRACTOR . <br /> Q . Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals . All <br /> costs to ENGINEER involved with subsequent submittals of Shop , <br /> Drawings , Samples or other items requiring approval , will be back-charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions . If the CONTRACTOR requests a substitution <br /> for a previously approved item , all of ENGINEER' S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR . <br /> R . Close Out Submittals : Refer to Section 1810 for specific general <br /> requirements on the submittal of closeout information , materials , tools , <br /> and similar items . <br /> + + END OF SECTION + + <br /> Last revised 7/ 17/01 0016-01340 Submittal of Shop Drawings <br /> 01340-6 rr <br /> FAEngineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016-01340 Submittal <br /> of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.