My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.rr <br /> thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> . . reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI- <br /> the Effective Date of the Agreement (unless otherwise NEER as provided below the schedules submitted in <br /> Will specified in the General Requirements), CONTRAC- accordance with paragraph 2 .05 . 13 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> .. 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER . <br /> of the Work, including any Milestones specified <br /> in the Contract Documents ; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 . a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule, for sequencing , scheduling , <br /> +� or progress of the Work nor interfere with or <br /> 3 , a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor, <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> 4W during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work . <br /> 3 . CONTRACTOR's schedule of values <br /> r will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWN E all and substance if it provides a reasonable <br /> each deliver to the other, with co ' o each allocation of the Contract Price to component <br /> aw additional insured identified in Supplementary parts of the Work . <br /> Conditions , certificates insurance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> evidence of insur which either of them or any AMENDING , REUSE <br /> additional Jpzttred may reasonably request) which <br /> op CON TOR and OWNER respectively are <br /> 3 . 01 Intent <br /> Article 5 . <br /> .. A. The Contract Documents are comple- <br /> 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all . <br /> to run , but before any Work at the Site is s , a B . It is the intent of the Contract Documents <br /> to <br /> conference attended by CONTRACT(OpeoERGINEER, describe a functionally complete Project (or part there- <br /> and others as appropriate will Meld to establish a of) to be constructed in accordance with the Contract <br /> working understanding g the parties as to the Documents . Any labor, documentation , services , <br /> Work and to disc a schedules referred to in para- materials , or equipment that may reasonably be <br /> graph 2 .05 rocedures for handling Shop Drawings inferred from the Contract Documents or from <br /> and er submittals , processing Applications for prevailing custom or trade usage as being required to <br /> produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER. <br /> 0016-00700 - General Conditions <br /> Page 9 of 44 <br /> F:\Engineering\Capital Projects\0016 & 0236- 41 st Street Improvements\0016 & 0236.41 st St Contract Docs\0016-00700 - General Conditions.doc <br /> arr <br />
The URL can be used to link to this page
Your browser does not support the video tag.