Laserfiche WebLink
3 . 3 .29 3 .4. 3 , 3 . 8 . 11 3 .99 3 . 18 .21 4. 2 . 3 , 4. 2. 61 10. 29 10. 31 6 . 2 .5 , 3. 14 <br /> 11 . 1 . 11 11 .4.71 14. 11 14.2 . 1 . 19 Damage to Construction of Owner or Separate <br /> Contractor' s Liability Insurance Contractors <br /> 11 . 1 3 . 14 .21 6 .2.41 9 . 2. 1 .59 10. 2 . 1 . 29 10 .2 .5 , 10 . 61 11 . 11 <br /> Contractor' s Relationship with Separate Contractors 11 .49 12 . 2 .4 <br /> and Owner' s Forces Damage to the Work <br /> 3 . 12 .51 3 . 14 . 2 , 4 .2.41 61 11 .4. 71 12. 1 .29 12 . 2 .4 3 . 14 .21 9 .9. 11 10.2 . 1 .21 10 .2.51 10 . 61 11 .41 <br /> 12 . 2.4 <br /> Contractor' s Relationship with Subcontractors Damages, Claims for <br /> 1 .2 .2, 3 . 3 .29 3 . 18 . 1 , 3 . 18 . 21 5 , 9 . 6 .29 9 . 6.77 9 . 10. 23 3 . 2 . 39 3 . 189 4. 3 . 10, 6. 1 . 19 8 .3 . 39 <br /> 9. 5 . 1 , 9 .6. 79 10. 3 .3 , <br /> 11 .4 . 1 . 2911 .4 .7111 .4 . 8 11 . 1 . 1111 .4 . 5911 .4.7914. 1 .3 , 14. 2 .4 <br /> Contractor ' s Relationship with the Architect Damages for Delay <br /> 1 . 1 .29 1 . 61 3 . 1 .39 3 .2 . 1 , 3 . 2 .21 3 .2 . 3 , 3 . 3 . 1 , 3 .4.2, 3 .5 . 1 , 6 . 1 . 11 8 . 3 . 3 , 9. 5 . 1 .69 9 .79 <br /> 10.3 .2 <br /> 3 .7 . 39 3 . 107 3 . 119 3 . 129 3 . 16, 3 . 189 4. 1 . 27 4. 1 . 31 4 .29 Date of Commencement of the Work, Definition of <br /> 4. 3 .49 4 .4. 11 4 .4 .79 5 .29 6 .2 .21 79 8 .3 . 19 9 .29 9 . 31 9 .41 8 . 1 . 2 <br /> 9 . 51 9 .79 9 . 8 , 9.9, 10. 2. 61 10. 39 11 . 3 , 11 .4 .71 123 Date of Substantial Completion, Definition of <br /> 13 .4.29 13 .5 8 . 1 . 3 <br /> Contractor' s Representations Day, Definition of <br /> 1 . 5 .21 3 .5 . 19 3 . 12.61 6. 2.2, 8 .2 . 1 , 9 . 3 . 39 9. 8 .2 8 . 1 .4 <br /> Contractor' s Responsibility for Those Performing the Decisions of the Architect <br /> Work 4 .2. 69 4.2 . 7 , 4. 2 . 119 4.2 . 12, 4 .2. 13 , 4. 3 .4, 4.4. 19 4 .4 . 59 <br /> 3 . 3 .2, 3 . 18, 4.2. 314 .3 .815 . 3 . 116. 1 . 316 . 216 .3 , 9 .5 . 1 , 4 .4. 614. 596 . 397 .3 .697 . 3 . 818 . 1 . 318 . 3 . 119. 219 .47 <br /> 10 9 . 5 . 19 9 . 8 .41 9. 9 . 11 13 .5 .21 14 . 2. 21 14. 2 . 4 <br /> Contractor' s Review of Contract Documents Decisions to Withhold Certification <br /> 1 . 5 . 29 3 . 21 3 .7 . 3 9 .4. 19 9.59 9 .71 14 . 1 . 1 . 3 <br /> Contractor' s Right to Stop the Work Defective or Nonconforming Work, Acceptance, <br /> 9 . 7 Rejection and Correction of <br /> Contractor' s Right to Terminate the Contract 2 . 3 , 2.41 3 . 5 . 11 4.2 .67 6 . 2. 51 9 . 5 . 11 9 .5 . 2, 9 . 6 .69 9 . 8 . 21 <br /> 4. 3 . 109 14. 1 9 . 9 . 31 9 . 10.41 12 .2 . 19 13 .7 . 1 . 3 <br /> Contractor' s Submittals Defective Work, Definition of <br /> 3 . 10, 3 . 11 , 3 . 12, 4. 2.715 . 2. 195 .2 . 397 . 3 .619 . 2, 9 . 3 , 3 . 5 . 1 <br /> 9 . 8 .279 . 8 . 3 , 9 .9 . 1 , 9. 10.2, 9 . 10. 3 , 11 . 1 .3 , 11 .5 .2 Definitions <br /> Contractor' s Superintendent 1 . 13 2. 1 . 1 , 3 , 11 3 .5 . 1 , 3 . 12 . 1 , 3 . 12 .27 3 . 12 . 31 4 . 1 . 1 , <br /> 3 .9 , 10. 2 . 6 4. 3 . 1 , 5 . 1 , 6 . 1 .21 7 .2 . 11 7 . 3 . 19 7 . 3 . 69 8 . 1 , 9 . 11 9 . 8 . 1 <br /> Contractor' s Supervision and Construction Delays and Extensions of Time <br /> Procedures 3 . 2 . 39 4. 3 . 19 4. 3 .47 4 .3 . 77 4.4 .51 5 . 2 .3 , 7 .2. 19 7 . 3 . 11 <br /> 1 . 2 .213 . 313 .413 . 12. 1094.2 .214.2 .794. 3 . 396 . 1 . 3 , 7 .4. 1 , 8.399 .5 . 199 .7 . 1910. 3 .21 10 .6 . 1 , 14 . 3 .2 <br /> 6.2 .49 7 . 1 . 31 7 .3 .4, 7 .3 .69 8 .2, 109 129 14 Disputes <br /> Contractual Liability Insurance 4. 1 .49 4. 31 4 .49 4.5 , 4. 61 6 . 31 7 .3 . 8 <br /> 11 . 1 . 1 . 8 , 11 .21 11 . 3 Documents and Samples at the Site <br /> Coordination and Correlation 3. 11 <br /> 1 . 29 1 .5 .21 3 . 3 . 19 3 . 109 3 . 12.61 6. 1 .39 6 . 2. 1 Drawings, Definition of <br /> Copies Furnished of Drawings and Specifications 1 . 1 . 5 <br /> 1 .69 2.2 . 59 3 . 11 Drawings and Specifications, Use and Ownership of <br /> Copyrights 1 . 1 . 1 , 1 . 3 , 2.2 . 5 , 3 . 119 5 .3 <br /> 1 . 6, 3 . 17 Effective Date of Insurance <br /> Correction of Work 8 .2. 21 11 . 1 . 2 <br /> 2 . 31 2 .49 3 . 7 .41 4.2 . 19 9 .4 . 2, 9 . 8 . 2 , 9 . 8 . 31 9 .9 . 19 12 . 1 .29 Emergencies <br /> 12 .29 13 .7 . 1 . 3 4 . 3 . 51 10e6, 14 . 1 . 1 .2 <br /> Correlation and Intent of the Contract Documents Employees , Contractor' s <br /> 1.2 3 . 3 . 21 3 .4. 39 3 . 8 . 19 3 .91 3 . 18 .21 4 . 2 . 37 4.2 .69 10 . 21 10. 39 <br /> Cost, Definition of 11 . 1 . 19 11 .4 .7 , 14 . 11 14 . 2 . 1 . 1 <br /> 7 . 3 .6 Equipment, Labor, Materials and <br /> Costs 1 . 1 . 3 , 1 . 1 . 61 3 .41 3 .5 . 11 3 . 8 .29 3 . 8 . 31 3 . 12, 3 . 13 , 3 . 15 . 1 , <br /> 2 .41 3 .2 . 39 3 .7 .41 3 . 8 . 2 , 3 . 15 .21 4. 31 5 .4. 2, 6 . 1 . 11 6 .2. 3 , 4 . 2. 69 4.2 . 71 5 . 2 . 19 6 . 2 . 1 , 7 .3 <br />. 6, 9 . 3 .21 9 . 3 . 31 9 .5 . 1 . 39 <br /> 7 . 3 .3 . 39 7 . 3 .6, 7 .3 .71 7 . 3 . 8 , 9 . 10. 29 10. 3 .27 10 .59 11 .31 9 . 10.29 10 . 2 . 1 , 10 . 2.41 14 . 2. 1 . 2 <br /> 11 .4, 12 . 19 12 .2 . 19 12 . 2 .49 13 . 5 , 14 Execution and Progress of the Work <br /> Cutting and Patching <br /> AIA Document A201TM - 1997. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1967, 1970, 1976, 1987 and <br />1997 by The <br /> American Institute of Architects. All rights reserved. WARNING : This AIA* Document is protected by U.S. Copyright Law and International Treaties. <br /> 4 <br /> Unauthorized reproduction or distribution of this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will <br /> be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17:14:54 on 05/25/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes: (3418817618) <br />