Laserfiche WebLink
Materials, Labor, Equipment and 1 . 61 2. 1 . 19 2.39 2 .41 3 .4. 21 3 . 8 . 1 , 3 . 12 . 109 3 . 14 . 29 4. 1 . 29 <br /> 1 . 1 . 39 1 . 1 . 69 1 .6 . 11 3 .4, 3 .5 . 19 3 . 8 . 21 3 . 8 .23, 3 . 127 3 . 139 4. 1 . 31 4 . 2.49 4. 2 .91 4 . 3 .6, 4 <br />.4.79 5 .2 . 19 5 . 2 .4 , 5 .4. 1 , <br /> 3 . 15 . 1 , 4.2 . 69 4 . 2.79 5 . 2. 11 6 .2 . 19 7 .3 . 6 , 9 . 3 .21 9 . 3 . 31 6 . 11 6. 3 , 7 .2. 11 7 .3 . 1 , 8 .2. 2 , <br /> 8 . 3 . 1 , 9. 3 . 1 , 9 . 3 .2 , 9 . 5 . 1 , <br /> 9 . 5 . 1 . 39 9 . 10.21 10. 2 . 1 , 10. 2 .4, 14 . 2 . 1 . 2 9 .9 . 11 9. 10 . 29 10. 3 . 21 11 . 1 . 39 11 . 3 . 11 11 <br />.4 . 31 11 .4. 10, <br /> Means, Methods , Techniques , Sequences and 12 . 2 .29 12 .3 . 19 13 . 2 .21 14. 39 14.4 <br /> Procedures of Construction Owner ' s Financial Capability <br /> 3 . 3 . 1 , 3 . 12 . 10, 4 . 2 .294. 2 .719 .4 .2 2 .2 . 19 13 .2 . 29 14. 1 . 1 .5 <br /> Mechanic ' s Lien Owner's Liability Insurance <br /> 4.4 . 8 11 .2 <br /> Mediation Owner' s Loss of Use Insurance <br /> 4 .4 . 1 , 4.4. 594 .4 .614 .4. 8 , 4.594 . 6 . 114. 6 .298 .3 . 11 10.5 11 .4 .3 <br /> Minor Changes in the Work Owner' s Relationship with Subcontractors <br /> 1 . 1 . 1 , 3 . 12 . 814. 2. 894. 3 .697 . 197.4 1 . 1 . 295 .295 . 3 , 5 .499 . 6 .479 . 10.2114.2 .2 <br /> MISCELLANEOUS PROVISIONS Owner's Right to Carry Out the Work <br /> 13 2.4, 12.2.4. 14.2.2.2 <br /> Modifications, Definition of Owner's Right to Clean Up <br /> 1 . 1 . 1 6.3 <br /> Modifications to the Contract Owner's Right to Perform Construction and to <br /> 1 . 1 . 11 1 . 1 . 2 , 3 .7 . 39 3 . 119 4. 1 .2, 4. 2 . 1 , 5 . 2. 39 7 , 8 .3 . 11 Award Separate Contracts <br /> 9 .71 10. 3 .2, 11 .4. 1 6. 1 <br /> Mutual Responsibility Owner's Right to Stop the Work <br /> 6.2 2.3 <br /> Nonconforming Work, Acceptance of Owner' s Right to Suspend the Work <br /> 9 . 6 .69 9 .9. 39 12.3 14. 3 <br /> Nonconforming Work, Rejection and Correction of Owner' s Right to Terminate the Contract <br /> 2 . 3 , 2 .493 .5 . 1 , 4 . 2 .696. 2 .599 . 5 . 199 . 8 . 219 .9 . 399. 10 .4 , 14 . 2 <br /> 12 .2 . 19 13 . 7 . 1 .3 Ownership and Use of Drawings, Specifications <br /> Notice and Other Instruments of Service <br /> 2 . 2. 112 . 392.413 . 2 . 393 . 3 . 113 . 7 .293 .7 .4, 3 . 12 . 914 . 39 1 . 1 . 1 , 1 .612. 2 .513 .2 . 1 , 3 . 11 . 1 , 3 . 17 . 194 .2 . 1295 <br />. 3 <br /> 4 .4 .8 , 4 . 6. 5 , 5 .2 . 1 , 8 .2 . 2 , 9 . 71 9 . 10, 10 . 2 .2 , 11 . 1 .31 Partial Occupancy or Use <br /> 11 .4.6712 .2.2712 . 2 .4913 .3913 .5 . 1 , 13 . 5 . 2, 14. 1114. 2 9 . 6 . 619.9911 .4 . 1 .5 <br /> Notice, Written Patching, Cutting and <br /> 2. 3 , 2 .493 . 3 . 193 .993 . 12 .993 . 12. 10, 4. 3 , 4.4. 8 , 4. 6 . 5 , 3. 1496.2.5 <br /> 5 . 2. 1 , 8 . 2. 29 9 .7 , 9. 10, 10 .2 . 2, 10. 39 11 . 1 . 39 11 .4 . 61 Patents <br /> 12 . 2 .21 12 . 2 .41 13.31 14 3 . 17 <br /> Notice of Testing and Inspections Payment, Applications for <br /> 13 .5 . 11 13 . 5 .2 4. 2. 59 7 . 3 . 81 9 . 2 , 9.39 9 .4, 9 .5 . 19 9 . 6 .31 9 . 7 . 11 9 . 8 . 51 <br /> Notice to Proceed 9 . 10. 1 , 9 . 10. 31 9 . 10.5 , 11 . 1 . 3 , 14.2 .49 14.4 .3 <br /> 8 . 2.2 Payment, Certificates for <br /> Notices, Permits, Fees and 4 . 2 . 5 , 4.2. 91 9 . 3 .3 , 9.4, 9. 5 , 9 . 6. 11 9 .6 . 69 9 .7 . 1 , 9. 10 . 11 <br /> 2. 2.21 3.71 3 . 13 , 7 . 3 .6 .49 10. 2 .2 9 , 10,3113 ,7t 14. 1 . 1 . 39 14. 2.4 <br /> Observations, Contractor' s Payment, Failure of <br /> 1 . 5 .29 3 .21 3 .7 . 39 4.3 .4 4. 3 . 6, 9 . 5 . 1 . 39 9.79 9 . 10 .29 14 . 1 . 1 . 39 14. 2. 1 .21 13 . 6 <br /> Occupancy Payment, Final <br /> 2. 2 .29 9 . 6. 69 9 . 8 , 11 .4 . 1 . 5 4. 2 . 19 4 . 2.99 4. 3 . 2 , 9 . 8 . 21 9 . 10, 11 . 1 . 2 , 11 . 1 .39 11 <br />.4. 13 <br /> Orders, Written 11 .4 .51 12 .3 . 11 13 . 77 14 .2.41 14.4. 3 <br /> 1 . 1 . 1 , 2 . 3, 3 .97 4 .3 . 67 7 , 8 .2 .21 11 .4.99 12 . 1 , 12.2, Payment Bond, Performance Bond and <br /> 13 .5 .21 14. 3 . 1 7 . 3 . 6.49 9 . 6 . 79 9. 10. 31 11 .4.99 11 .5 <br /> OWNER Payments, Progress <br /> 2 4. 3 . 39 9 . 31 9 . 69 9 .8 . 51 9 . 10. 39 13 . 67 14 . 2 . 3 <br /> Owner, Definition of PAYMENTS AND COMPLETION <br /> 2 . 1 9 <br /> Owner, Information and Services Required of the Payments to Subcontractors <br /> 2. 1 . 29 2.29 3 .2 . 11 3 . 12 .4, 3 . 12. 10, 4. 2 .79 4 . 3 . 39 6 . 1 . 39 5 .4 . 2, 9 . 5 . 1 . 31 9 . 6 . 21 9 . 6 .39 9 . 6 <br />.49 9 .6. 7 , 11 .4. 81 <br /> 6. 1 .49 6 . 2.51 9 . 3 .21 9 .6 . 11 9 .6.4, 9 . 9 . 21 9 . 10. 39 10. 3 . 3 , 14. 2 . 1 .2 <br /> 11 .21 11 .41 13 .5 . 11 13 . 5 .2 , 14. 1 . 1 .4, 14 . 1 .4 PCB <br /> Owner' s Authority 10. 3 . 1 <br /> AIA Document A201TM - 1997. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1967, 1970 , 1976, 1987 and <br /> 1997 by The <br /> American Institute of Architects. All rights reserved. WARNING : This AIA7D Document is protected by U.S. Copyright Law and International Treaties. <br /> 6 <br /> Unauthorized reproduction or distribution of this AIA* Document, or any portion of it, may result in severe civil and criminal penalties, and will <br /> be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17: 14 :54 on 05/25/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes: (3418817618) <br />