Laserfiche WebLink
or equipment will not be accepted by ENGINEER D . Special Guarantee: OWNER may require CON- <br /> from anyone other than CONTRACTOR. TRACTOR to furnish at CONTRACTOR's expense a special <br /> performance guarantee or other surety with respect to any <br /> vow c. The procedure for review by ENGINEER substitute. <br /> will be as set forth in paragraph 6.05.A. 2.d , as <br /> supplemented in the General Requirements and as E. ENGINEER's Cost Reimbursement: ENGINEER will <br /> ENGINEER may decide is appropriate under the record time required by ENGINEER and ENGINEER's Consul- <br /> circumstances . tants in evaluating substitute proposed or submitted by <br /> CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6. 05. 6 <br /> d. CONTRACTOR shall first make written and in making changes in the Contract Documents (or in the <br /> application to ENGINEER for review of a proposed provisions of any other direct contract with OWNER for work on <br /> substitute item of material or equipment that the Project) occasioned thereby. Whether or not ENGINEER <br /> CONTRACTOR seeks to furnish or use. The approves a substitute item so proposed or submitted by CON- <br /> application shall certify that the proposed substitute TRACTOR, CONTRACTOR shall reimburse OWNER for the <br /> item will perform adequately the functions and charges of ENGINEER and ENGINEER's Consultants <br /> for <br /> achieve the results called for by the general design, evaluating each such proposed substitute. <br /> be similar in substance to that specified, and be <br /> suited to the same use as that specified. The appli- F. CONTRACTOR's Expense: CONTRACTOR shall <br /> cation will state the extent, if any, to which the use provide all data in support of any proposed <br /> substitute or <br /> of the proposed substitute item will prejudice "or-equal" at CONTRACTOR's expense. <br /> CONTRACTOR's achievement of Substantial <br /> Completion on time, whether or not use of the 6.06 Concerning Subcontractors, Suppliers, and Others{tc <br /> proposed substitute item in the Work will require a \n "6.06 Concerning Subcontractors, Suppliers, and Others"j <br /> change in any of the Contract Documents (or in the <br /> provisions of any other direct contract with OWNER A. CONTRACTOR shall not employ any Subcontractor, <br /> for work on the Project) to adapt the design to the Supplier, or other individual or entity (including those acceptable <br /> proposed substitute item and whether or not to OWNER as indicated in paragraph 6.06. 6), whether initially <br /> incorporation or use of the proposed substitute item or as a replacement, against whom OWNER may have reason- <br /> in connection with the Work is subject to payment of able objection. CONTRACTOR shall not be required to employ <br /> any license fee or royalty. All variations of the pro- any Subcontractor, Supplier, or other individual or entity <br /> to <br /> posed substitute item from that specified will be furnish or perform any of the Work against whom <br /> identified in the application , and available CONTRACTOR has reasonable objection, <br /> engineering , sales, maintenance, repair, and <br /> replacement services will be indicated , The B. If the Supplementary Conditions require the identity of <br /> application will also contain an itemized estimate of certain Subcontractors, Suppliers , or other individuals or entities <br /> all costs or credits that will result directly or indirectly to be submitted to OWNER in advance for acceptance by <br /> from use of such substitute item, including costs of OWNER by a specified date prior to the Effective Date of the <br /> redesign and claims of other contractors affected by Agreement, and if CONTRACTOR has submitted a list thereof <br /> any resulting change, all of which will be considered in accordance with the Supplementary Conditions, OWN €R's <br /> by ENGINEER in evaluating the proposed substitute acceptance (either in writing or by failing to make written objec- <br /> item. ENGINEER may require CONTRACTOR to tion thereto by the date indicated for acceptance or objection in <br /> furnish additional data about the proposed the Bidding Documents or the Contract Documents ) of any such <br /> substitute item. Subcontractor, Supplier, or other individual or entity so identified <br /> may be revoked on the basis of reasonable objection after due <br /> B . Substitute Construction Methods or Procedures: If a investigation. CONTRACTOR shall submit an acceptable <br /> specific means , method , technique, sequence, or procedure of replacement for the rejected Subcontractor, Supplier, or other <br /> construction is shown or indicated in and expressly required by individual or entity, and the Contract Price will be adjusted <br /> by <br /> the Contract Documents, CONTRACTOR may furnish or utilize the difference in the cost occasioned by such replacement, and <br /> a substitute means, method, technique, sequence, or procedure an appropriate Change Order will be Issued or Written <br /> of construction approved by ENGINEER. CONTRACTOR shall Amendment signed . No acceptance by OWNER of any such <br /> submit sufficient information to allow ENGINEER, in Subcontractor, Supplier, or other individual or entity, whether <br /> ENGINEER's sole discretion, to determine that the substitute initially or as a replacement, shall constitute a waiver <br /> of any <br /> proposed is equivalent to that expressly called for by the fight of OWNER or ENGINEER to reject defective Work. <br /> Contract Documents. The procedure for review by ENGINEER <br /> will be similar to that provided in subparagraph 6. 05.A.2. C. CONTRACTOR shall be fully responsible to OWNER <br /> and ENGINEER for all acts and omissions of the <br /> C. Engineer's Evaluation: ENGINEER will be allowed a Subcontractors, Suppliers , and other individuals or entities <br /> reasonable time within which to evaluate each proposal or performing or furnishing any of the Work just as <br /> submittal made pursuant to paragraphs 6. 05.A and 6.05. 6. CONTRACTOR is responsible for CONTRACTOR's own acts <br /> ENGINEER will be the sole judge of acceptability. No "or-equal" and omissions. Nothing in the Contract Documents shall create <br /> or substitute will be ordered , installed or utilized until for the benefit of any such Subcontractor, Supplier, or other <br /> ENGINEER's review is complete, which will be evidenced by individual or entity any contractual relationship between <br /> either a Change Order for a substitute or an approved Shop OWNER or ENGINEER and any such Subcontractor, Supplier <br /> Drawing for an "or equal . " ENGINEER will advise or other individual or entity, nor shall it create any obligation on <br /> CONTRACTOR in writing of any negative determination , the part of OWNER or ENGINEER to pay or to see to the <br /> *41W payment of any moneys due any such Subcontractor, Supplier, <br /> 00700 - 17 <br />