Laserfiche WebLink
5. Remote Lighting Control System : System shall include lighting contactors. System shall allow <br /> owner and users with a security code to schedule on/off system operation via a web site, <br /> phone, fax or email up to ten years in advance. Manufacturer shall provide and maintain a two- <br /> way TCP/IP communication link. Trained staff shall be available 24/7 to provide scheduling <br /> support and assist with reporting needs . <br /> The owner may assign various security levels using a user code and password to schedulers <br /> by function and/or fields. This function must be flexible to allow a range of privileges such as full <br /> scheduling capabilities for all fields, to only having permission to execute "early off' commands <br /> by phone or extend the field usage. <br /> On site equipment shall include Manual Off-On-Auto Switches to allow for maintenance, and <br /> shall accept and store 7-day schedules . The controller shall be protected against power <br /> outages / memory loss and shall reboot once power is regained and execute any commands <br /> that would have occurred during outage . <br /> 6. Management Tools: Manufacturer shall make available a web-based database of actual field <br /> usage and provide reports by facility and user group . <br /> 7. Communication Costs : Manufacturer shall include communication costs for operating the <br /> controls and monitoring system for a period of 25 years. <br /> II . SPORTS LIGHTING = SPORTSCLUSTER GREENTIM SYSTEM <br /> A. BASE BID LIGHTING EQUIPMENT <br /> The primary goals of this sports lighting specification are: <br /> 1 . Life Cycle Costs : In order to reduce the operating budget, the preferred lighting system shall <br /> be energy efficient and cost effective to operate. <br /> 2. Environmental Light Control: It is the primary goal of this project to minimize spill light and <br /> glare. <br /> 3 . Guaranteed Light Levels : Selection of appropriate light levels impact the safety of the players <br /> and the enjoyment of spectators. Therefore the lighting system shall be designed such that the <br /> light levels are guaranteed for a period of 10 years . <br /> B. LIGHTING PERFORMANCE / PLAYABILITY <br /> The manufacturer shall supply lighting equipment to meet the following performance and life <br /> cycle cost criteria: <br /> 1 . Playing surfaces shall be lit to an average constant light level and uniformity as specified per <br /> the bid sheet. Light levels shall be held constant for 5000 hours. Lighting calculations shall be <br /> developed and field measurements taken on the grid spacing with the minimum number of grid <br /> points specified on the bid sheet. Measured average illumination level shall be +/- 10% of <br /> predicted mean in accordance with IESNA RP-6-01 , and measured at the first 100 hours of <br /> operation . <br /> 2. Manufacturer shall provide computer models guaranteeing light levels on the field for 10 years <br /> with a recoverable light loss factor of .7 in all applications . <br /> C. LIFE CYCLE COST <br /> 1 . Energy Consumption : The average kWh consumption shall be calculated by the following <br /> criteria: # luminaries x kw demand x kw rate of .22/hr x annual usage of 400 hours x 25 years . <br /> Jacksonville Spec 04-24r5.doc 7 Created on 1211 /2006 4:32 PM <br />