Laserfiche WebLink
5A 0 POTABLE WATER <br /> 5.01 16" x 6" Tapping Sl"ve & Valve 1 EACH 54,500.00 54,5D0.00 100% 54,500.00 <br /> 5.02 10" x 6" Tapping Sleeve & Valve I EACH 53,900.00 53,900.00 100% 50.00 <br /> 5.03 6" Directional Bore $3,900.00 50.00 <br /> 1 L.S. $5,200.00 55,200.00 1004/. $5,200.00 <br /> 5.04 Fi Gate Valves 10 EACH 5700.D0 57�000.pp 100% 50.00 <br /> 5.05 Fire Hydrant Assembly (w/ Valve & Tee) 5 P.ACH 37,000.00 50.00 <br /> 53,100.00 $ 15,500.00 100% $ 15500.00 SO.00 <br /> 5.06 6" PVC Wacer line 4,436 LF. 51330 5581999.80 100% 558,996.80 <br /> 5.07 Double Service 65 EACH 5635.00 541,275.00 100% 541,275.00 $0.00 <br /> 5.08 Single -Off 7 EACH $500.00 $3500.00 1O00/o -. S3,500.00 00 50.00 <br /> 5.09 2" Blow-Off I EACH 51150.00 $850.00 100% 5 SO.00 <br /> 5850.00 50.00 <br /> Sub-Total $140,723.80 5140,723.80 $0,00 <br /> 6.00 MISCELLANEOUS <br /> 6.01 Strtetlights 9 EACH $ 1 ,200.00 $10,800.00 100% 310,800.00 t <br /> 6.02 Landscaping 50.00 <br /> Canopy Tnes (Oaks, Palms, Hollys) 78 EACH 5300.00 $23,400.00 100% $23,400.00 50.00 i <br /> UnderatoryTr"s (Myrtles, Oleanders) 94 EACH <br /> $150.00 $ 14,100.00 100% 514,100.00 50.00 <br /> - 6-Foot High <br /> PV F 775 EACH 57.50 $5,812.50 1000/, $5,812.50 <br /> - 6-Foot PVC Fence 4,930 L.F. 532.00 $ 157,760.00 100% $157,760.00 $000 <br /> 6.03 Aske-Out I LS. $20,000.00 $20,000.00 100% $20,000.00 50.00 <br /> 6.04 As-Buil[ Surveys 1 L.S. $9,000.00 59,00000 p% SO-00 <br /> 6.05 Installation of PCP's . <br /> 1 L. S. $200000 $0.00 $9,000.00 <br /> 6.06 Lot Comer Monumentation $2.000'00 100% $2,000.00 50.00 <br /> 138 LOTS 5100.00 $ 13,800.00 100% $ 13,800.00 <br /> 6.07 Engineering / Inspections 1 LS. $101000.00 SI0,000.00 95% 591500.00 50.00 <br /> 5500.00 <br /> Sub-Total $266,672.50 5257, 172.50 59,500.00 <br /> 7.00 OFF-SITE ROADWAY IMPROVEMENTS <br /> 7.01 16th Street Tom Lane <br /> - Import Fill 1495 C.Y. $6.45 $9,642.75 100% $9,642.75 <br /> - Grading 1 L.S. 59,790.00 $0.00 <br /> - 12" Stabilized Sub 59,790.00 100% 59,790.00 $0.00 <br /> 8rade 1385 S.Y. 54.85 56,71725 IDV% 56,71725 $0.00 <br /> - 8" Limerock Bele 1025 S.Y. 51530 515,662.50 ] OD0/o $15,662.50 <br /> - 1 .5" Type S-I Asphalt (Base Course) 895 S.Y. $620 55,549.00 100% 55,549.00 $0.00 <br /> - I " Type S-ID Asphalt (Surfece Course) 6405 S.Y. 54. 15 $26,580.75 ]00% 526,580.75 50.00 t <br /> - Striping 1 LS. 512,625.00 512,625.00 100% 512,625.00 50.00 <br /> - 16th Street Sidewalk 640 S.Y. $45.90 529,376.00 $0.00 <br /> 7.02 82nd Avenue Tum Lane 100% 529,37 - $0,00 <br /> - Import Fill 2200 C.Y. $6.45 $ 14, 190.00 100% $ 14,190.00 <br /> - Grading 1 LS. $ 18,750.00 50.00 <br /> 518,750.00 ] 00% $ 18,750.00 50.00 <br /> - Type 'C Catch Basin 1 EACH $2,100.00 52,100.00 0% <br /> - 18" C.A.P. 84 LF. $0.00 $2,100.00 <br /> $41 .50 53,486.00 0% $O.00 $3,486.00 <br /> - Re-Grade Swale 525 LF. $5.00 52,625.00 O4/" <br /> - Ire-Sod Swale $0.00 $2,625.00 <br /> - 12" Stabilized Subgrade 1800 S.Y. 52.25 <br /> 54,050.00 0% 50.00 54,050.00 <br /> 4375S.Y. $4.85 $21,218.75 100'/. 521 ,218.75 $0.00 <br /> - 8" Lim rock Base 3204 S.Y. 51530 $49,02110 100% 549,021.20 <br /> - 1 .5" Type S-I Asphalt (Base Comae) 2825 S.Y. $6.20 S17.515.00 100% 517,515.00 SON <br /> - <br /> [ " Type 5-ID Asphalt (Sulfa" Goatee) 8255 S.Y. $4. 15 534,25825 $0.00 <br /> lOD% $34,256.25 <br /> . Striping I LS. $13,965.00 $13,965.00 $0.00 - <br /> - I00% 513,965.00 $O.00 <br /> 82nd Avenue Sidewalk <br /> 700 S.Y. 545.90 $32,130.00 100% $32,130.00 $0.00 <br /> Sub-Total 5297,142.45 $284,881 .45 $ 12,261.00 <br /> Remainin Ira mvement Total $1,9819739.05 98.83% 51,958 485.80 $23 5335 <br /> Letter of Credit Amount 125% 529,06656 <br /> Page 2 <br />