Laserfiche WebLink
• SECTION 00520 - Agreement (Public Works) <br />• THIS AGREEMENT is by and between INDIAN RIVER COUNTY , a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , (hereinafter called <br /> OWNER) <br /> andPY1a-i� <br />.. (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> a agree as follows: <br /> ARTICLE 1 - WORK <br /> a 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents . The Work is generally described as follows : <br /> a Roadway improvements consisting of roadway widening , horizontal and vertical <br /> realignment and intersection improvements. Drainage improvements consisting of removal <br /> of old piping and installation of new piping and structures. Construction of a new ditch and <br /> a associated supporting structures and facilities . <br /> ARTICLE 2 - THE PROJECT <br /> a 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> Project Name : 4th Street/Cooch Ditch Bridge Replacement & 11th Street SW Paving <br /> and Drainage <br /> County Project Number: 0209 & 9321 <br />+� Project Address : 4th Street at 35th Avenue <br /> 11th Street SW between 17th Avenue SW to 9th Court SW <br /> Vero Beach , Florida <br /> a <br /> ARTICLE 3 — ENGINEER <br /> 3. 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> a and will act as OWNER's representative, assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> a 4. 01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract . <br /> a <br /> Special conditions: The construction window within the IRFWMD ROW for the Cooch <br /> Ditch Bridge Replacement is between December 1 , 2006 through May 31 , 2007 . <br /> a <br /> a <br /> 0209-00520 - Agreement (Public Works).doc <br /> EAEngineenngZapital Projecu;=94th Street Bridge Over Ccoch 0itctii=94th Street Bridge Over Coon 07-20-0510209-00520 - Agreement (Public Works).docRev. <br /> a 05/01 - 2 - <br />