Laserfiche WebLink
i <br /> 17 . Drawings—That part of the Contract completion date or time prior to Substantial Comple- _ <br /> Documents prepared or approved by ENGINEER tion of all the Work, <br /> which graphically shows the scope, extent, and 28. Notice of Award—The written notice by <br /> character of the Work to be performed by _ <br /> CONTRACTOR. Shop Drawings and other OWNER <br /> on Rol the compliancerent by the successful <br /> bidderapparent tatting that <br /> CONTRACTOR submittals are not Drawings as so sful <br /> bidder with the onditions precedent listed therein , <br /> defined. OWNER will sign and deliver the Agreement. _ <br /> 18 . Effective Date o; the Agreement The <br /> 29. Notice to Proceed—A written notice given <br /> date indicated in the Agreement on which it becomes <br /> effective, but if no such date is indicated , it means the which <br /> OWNER Contract <br /> CONTRACTOR fixing the date on i <br /> ll commence to run and <br /> date on which the Agreement is signed and delivered on which CONTRACTOR shall art to perform the <br /> by the last of the two parties to sign and deliver. Work under the Contract Documents. <br /> 19. ENGINEER—The individual or entity <br /> named as such in the Agreement. OWNER—The individual, entity public <br /> body, or <br /> authority with whom CONTRACTOR has <br /> o, entered into the Agreement and for whom the Work is <br /> entity having a contract with ENGIN - o fumish to be performed . i <br /> services as ENGINEER's ' ndent professional 31 . Partial Utilization—Use by OWNER of a <br /> associate or cons th respect to the Project and <br /> who i ied as such in the Supplementary posetfor whichnitisYintendeded part f(otr aVrelated rpurpose) i <br /> prior to Substantial Completion of all the Work. <br /> 21 . Field Order—A written order issued by 32. PCBs—Polychlorinated biphenyls. <br /> ENGINEER which requires minor changes in the <br /> Work but which does not involve a change in the 33. Petroleum—Petroleum , including crude oil <br /> Contract Price or the Contract Times. or any fraction thereof which is liquid at standard <br /> 22. General Requirements—Sections of conditions of temperature and pressure (60 degrees i <br /> Division 1 of the Specifications . The General Fahrenheit and 14.7 pounds per square inch <br /> sludge, oil <br /> Requirements pertain to all sections of the Specifics- aefuslet gasoline, sker seneI such oil, !eumand oie, fulmixedoil , l with other <br /> tions . non-Hazardous Waste and crude oils . i <br /> 23. Hazardous Environmental Condition—The 34. Project—The total construction of which <br /> presence at the Site of Asbestos, PCBs, Petroleum , <br /> Hazardous Waste, or Radioactive Material in such the Work to be performed under the Contract i <br /> quantities or circumstances that may prexposed a Documents <br /> elsewheremay bein the Contract Document the whole, or a part as may be <br /> substantial danger to persons or property <br /> thereto in connection with the Work. 35 . Project Manual—The bound documentary <br /> 24. Hazardous Waste—The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work. A listing of the content of the Project Manual, <br /> 1004 of the Solid Waste Disposal Act (42 USC contained nthetables)ich may be bound lotcoe or more volumes, is <br /> Section 6903) as amended from time to time. <br /> 25. Laws and Regulations; Laws or Regulat- <br /> 36. Radioactive Material—Source, special <br /> ions—Any and ail applicable laws , rules, regulations, nuclear, or byproduct material as defined by the <br /> ordinances, codes, and orders of any and all govem- Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> mental bodies, agencies, authorities, and courts seq.) as amended from time to time. ■ <br /> having jurisdiction. 37. Resident Project Representative—The <br /> 26. Gens—Charges, security interest , or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds, real property, or assigned to the Site or any part thereof. <br /> personal property. 38. Samples—Physical examples of <br /> 27. Milestone—A principal event specified in materials, equipment, or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion0209-00700 <br /> the o 0 oo`Nork ac as which <br /> • <br /> Page 6 of 44 <br /> F:1EngrneeringXUPUI Projectet0209-0 Street Bridge Over Conch OItcM102094th Street Bridge Over Cooeh 07-20-06 0209-00700 - General Coeditlo dx 4 <br />