My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-401
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:46:22 PM
Creation date
9/30/2015 10:19:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/21/2006
Control Number
2006-401
Agenda Item Number
7.H.
Entity Name
Timothy Rose Contracting, Inc.
Subject
4th. St./Cooch Ditch Bridge/11th. St.SW Paving
Project Number
9321
Archived Roll/Disk#
4008
Supplemental fields
SmeadsoftID
5969
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work . <br /> .. <br /> 4. 08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br /> .. premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods, techniques , sequences , and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br /> given ENGINEER written notice of all conflicts , errors, ambiguities, and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> r convey understanding of all terms and conditions for performing and furnishing the Work. <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> r <br /> 5. 01 The date, time, and location for a Pre-Bid conference , if any, are specified in the <br /> Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss <br /> the Project. Bidders are encouraged to attend and participate in the conference . ENGINEER will <br /> transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in <br /> r response to questions arising at the conference . Oral statements may not be relied upon and will <br /> not be binding or legally effective. <br /> r <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> r <br /> 6 . 01 The Site is identified in the Bidding Documents. All additional lands and access <br /> thereto required for temporary construction facilities, construction equipment, or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for by <br /> r CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents . <br /> r <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> r <br /> 7. 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to ENGINEER in writing . Interpretations or clarifications considered necessary by <br /> r ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all <br /> parties through the Issuing Office as having received the Bidding Documents . Questions received <br /> less than ten days prior to the date for opening of Bids may not be answered . Only questions <br /> ,. answered by Addenda will be binding . Oral and other interpretations or clarifications will be <br /> without legal effect. <br /> r 7. 02 Addenda may be issued to clarify, correct, or change the Bidding Documents as <br /> deemed advisable by OWNER or ENGINEER . <br /> 0209-00200 - Instructions to Bidders.doc <br /> 00200 - 4 <br /> r FAEngineerin9\Capital Proleds10209- th Street Bridge Dver Coots DR02N9 th Street Bridge Over Cooc 07-20-W=09-00200 - Instrutlbns to Bidders.doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.