Site which was not shown or indicated , or not property monuments by professionally qualified <br /> +� shown or indicated with reasonable accuracy in personnel. <br /> the Contract Documents , CONTRACTOR shall, <br /> promptly after becoming aware thereof and 4. 06 Hazardous Environmental Condition at Site <br /> r before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6. 16.A) , identify the owner of those reports and drawings relating to a Hazardous <br /> +� such Underground Facility and give written Environmental Condition identified at the Site , if any, <br /> notice to that owner and to OWNER and ENGI- that have been utilized by the ENGINEER in the <br /> NEER. ENGINEER will promptly review the preparation of the Contract Documents. <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B. Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility. During such time, contained in such reports and drawings, but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents. <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> r Facility. Supplementary Conditions. Except for such reliance <br /> on such "technical data ," CONTRACTOR may not rely <br /> 2. If ENGINEER concludes that a upon or make any Claim against OWNER, <br /> change in the Contract Documents is required , ENGINEER or any of ENGINEER's Consultants with <br /> r a Work Change Directive or a Change Order respect to: <br /> will be issued to reflect and document such <br /> consequences. An equitable adjustment shall 1 . the completeness of such reports <br /> be made in the Contract Price or Contract and drawings for CONTRACTOR's purposes, <br /> Times, or both , to the extent that they are including, but not limited to, any aspects of the <br /> attributable to the existence or location of any means, methods, techniques, sequences and <br /> Underground Facility that was not shown or procedures of construction to be employed by <br /> r indicated or not shown or indicated with CONTRACTOR and safety precautions and <br /> reasonable accuracy in the Contract programs incident thereto; or <br /> Documents and that CONTRACTOR did not <br /> know of and could not reasonably have been 2. other data, interpretations, opinions <br /> expected to be aware of or to have anticipated. and information contained in such reports or <br /> If OWNER and CONTRACTOR are unable to shown or indicated in such drawings; or <br /> agree on entiflement to or on the amount or <br /> ,. extent, if any, of any such adjustment in 3. any CONTRACTOR interpretation of <br /> Contract Price or Contract Times, OWNER or or conclusion drawn from any "technical data' <br /> CONTRACTOR may make a Claim therefor as or any such other data, interpretations , opinions <br /> provided in paragraph 10.05. or information. <br /> r <br /> 4. 05 Reference Points C. CONTRACTOR shall not be responsible for <br /> any Hazardous Environmental Condition uncovered or <br /> r A. OWNER shall provide engineering surveys to revealed at the Site which was not shown or indicated <br /> establish reference points for construction which in in Drawings or Specifications or identified in the <br /> ENGINEER's judgment are necessary to enable Contract Documents to be within the scope of the <br /> CONTRACTOR to proceed with the Work. CON- Work. CONTRACTOR shall be responsible for a <br /> r TRACTOR shall be responsible for laying out the Hazardous Environmental Condition created with any <br /> Werk, shall protect and preserve the established materials brought to the Site by CONTRACTOR, <br /> reference points and property monuments, and shall Subcontractors, Suppliers , or anyone else for whom <br />.. make no changes or relocations without the prior CONTRACTOR is responsible. <br /> written approval of OWNER. CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or D. If CONTRACTOR encounters a Hazardous <br /> property monument is lost or destroyed or requires Environmental Condition or if CONTRACTOR or <br /> relocation because of necessary changes in grades or anyone for whom CONTRACTOR is responsible <br /> locations, and shall be responsible for the accurate creates a Hazardous Environmental Condition , <br /> replacement or relocation of such reference points or CONTRACTOR shall immediately: (i) secure or <br /> r otherwise isolate such condition; (il) stop all Work in <br /> 0208-00700 - General Cmdrtlonedoc <br /> Page 13 of 44 <br /> FiEnglneeringtCapital Praiecis102 th Street Bridge Over Gooch Dltrh102094th Street Bridge Over Cooch 07-2006W209Z0700 - General CmWitwns.doc <br /> i <br />