My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.04 Starting the Work deli.,°_ t., the other with pies to each additional :.,".. eg <br /> identified the Supplementary <br /> pleme ry Conditions e_tifioates-of <br /> A. CONTRACTOR shall start to perform the Work <br /> on the date when the Contract Times commence to run. No them or ary additional :.. .._ed m reasonably -o,.. . est) <br /> Work shall be done at the Site prior to the date on which the h ' h GONTn A CTOn and OWNER Fespeotivel. "_ _ <br /> Contract Times commence to run. required to p�h -se and maintain in Aoot;FdAnee �Ai <br /> Artisle 5 <br /> 2.05 Before Starting Construction rT <br /> Paragraph 2.06.A has been deleted and replaced with a <br /> A. CONTRACTOR 's Review of Contract Documents: new paragraph. See the Supplementary Conditions. <br /> Before undertaking each part of the Work, 2. 06 Preconstruction Conference <br /> CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent figures A . Witliin on days "fie_ tl., C;e11ti_,.. T:...es start <br /> therein and all applicable field measurements. Fan, but before any Work at die Site is started a ,.,...e <br /> CONTRACTOR shall promptly report in writing to at4ended by GONTn ACTOo ct,lnrhmco and ..the_.. " <br /> ENGINEER any conflict, error, ambiguity, or discrepancy apprepnate will be 'yield to estab'.icE a ^-=v-^b <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER discussthy, sehed..les -'`"'ed ._.._.h 2 nc n <br /> before proceeding with any Work affected thereby; proceduEes f_ h.... ,." and ,.the_ <br /> however, CONTRACTOR shall not be liable to OWNER h :»"' " _ " __'< .ions for Paymef* 41d <br /> or ENGINEER for failure to report any conflict, error, <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known 2 .07 Initial Acceptance of Schedules <br /> thereof. <br /> A. Unless otherwise provided in the Contract Docu- <br /> B. Preliminary Schedules: Within ten days after the ments, at least ten days before submission of the fust <br /> Effective Date of the Agreement (unless otherwise specified Application for Payment a conference attended by CON- <br /> in the General Requirements), CONTRACTOR shall TRACTOR, ENGINEER, and others as appropriate will be <br /> submit to ENGINEER for its timely review: held to review for acceptability to ENGINEER as provided <br /> below the schedules submitted in accordance with <br /> I . a preliminary progress schedule indicat- paragraph 2.05 .B . CONTRACTOR shall have an <br /> ing the times (numbers of days or dates) for starting additional ten days to make corrections and adjustments and <br /> and completing the various stages of the Work, to complete and resubmit the schedules. No progress <br /> including any Milestones specified in the Contract payment shall be made to CONTRACTOR until acceptable <br /> Documents; schedules are submitted to ENGINEER. <br /> 2. a preliminary schedule of Shop Drawing 1 . The progress schedule will be acceptable <br /> and Sample submittals which will list each required to ENGINEER if it provides an orderly progression <br /> submittal and the times for submitting, reviewing, of the Work to completion within any specified <br /> and processing such submittal; and Milestones and the Contract Times. Such accep- <br /> tance will not impose on ENGINEER responsibility <br /> 3 . a preliminary schedule of values for all of for the progress schedule, for sequencing, schedul- <br /> the Work which includes quantities and prices of ing, or progress of the Work nor interfere with or <br /> items which when added together equal the Contract relieve CONTRACTOR from CONTRACTOR's <br /> Price and subdivides the Work into component parts full responsibility therefor. <br /> in sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such 2. CONTRACTOR's schedule of Shop <br /> prices will include an appropriate amount of Drawing and Sample submittals will be acceptable <br /> overhead and profit applicable to each item of to ENGINEER if it provides a workable <br /> Work. arrangement for reviewing and processing the <br /> required submittals. <br /> Paragraph 2.05.0 has been deleted and replaced with a <br /> new paragraph. See the Supplementary Conditions. 3 . CONTRACTOR's schedule of values <br /> G r. .r.a..nee of Insuizance. Before any x efk at rho will be acceptable to ENGINEER as to form and <br /> Site is stai4ed, GONTR GTOn and 01AWER ,.h" ll each <br /> 00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.