2.04 Starting the Work deli.,°_ t., the other with pies to each additional :.,".. eg <br /> identified the Supplementary <br /> pleme ry Conditions e_tifioates-of <br /> A. CONTRACTOR shall start to perform the Work <br /> on the date when the Contract Times commence to run. No them or ary additional :.. .._ed m reasonably -o,.. . est) <br /> Work shall be done at the Site prior to the date on which the h ' h GONTn A CTOn and OWNER Fespeotivel. "_ _ <br /> Contract Times commence to run. required to p�h -se and maintain in Aoot;FdAnee �Ai <br /> Artisle 5 <br /> 2.05 Before Starting Construction rT <br /> Paragraph 2.06.A has been deleted and replaced with a <br /> A. CONTRACTOR 's Review of Contract Documents: new paragraph. See the Supplementary Conditions. <br /> Before undertaking each part of the Work, 2. 06 Preconstruction Conference <br /> CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent figures A . Witliin on days "fie_ tl., C;e11ti_,.. T:...es start <br /> therein and all applicable field measurements. Fan, but before any Work at die Site is started a ,.,...e <br /> CONTRACTOR shall promptly report in writing to at4ended by GONTn ACTOo ct,lnrhmco and ..the_.. " <br /> ENGINEER any conflict, error, ambiguity, or discrepancy apprepnate will be 'yield to estab'.icE a ^-=v-^b <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER discussthy, sehed..les -'`"'ed ._.._.h 2 nc n <br /> before proceeding with any Work affected thereby; proceduEes f_ h.... ,." and ,.the_ <br /> however, CONTRACTOR shall not be liable to OWNER h :»"' " _ " __'< .ions for Paymef* 41d <br /> or ENGINEER for failure to report any conflict, error, <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known 2 .07 Initial Acceptance of Schedules <br /> thereof. <br /> A. Unless otherwise provided in the Contract Docu- <br /> B. Preliminary Schedules: Within ten days after the ments, at least ten days before submission of the fust <br /> Effective Date of the Agreement (unless otherwise specified Application for Payment a conference attended by CON- <br /> in the General Requirements), CONTRACTOR shall TRACTOR, ENGINEER, and others as appropriate will be <br /> submit to ENGINEER for its timely review: held to review for acceptability to ENGINEER as provided <br /> below the schedules submitted in accordance with <br /> I . a preliminary progress schedule indicat- paragraph 2.05 .B . CONTRACTOR shall have an <br /> ing the times (numbers of days or dates) for starting additional ten days to make corrections and adjustments and <br /> and completing the various stages of the Work, to complete and resubmit the schedules. No progress <br /> including any Milestones specified in the Contract payment shall be made to CONTRACTOR until acceptable <br /> Documents; schedules are submitted to ENGINEER. <br /> 2. a preliminary schedule of Shop Drawing 1 . The progress schedule will be acceptable <br /> and Sample submittals which will list each required to ENGINEER if it provides an orderly progression <br /> submittal and the times for submitting, reviewing, of the Work to completion within any specified <br /> and processing such submittal; and Milestones and the Contract Times. Such accep- <br /> tance will not impose on ENGINEER responsibility <br /> 3 . a preliminary schedule of values for all of for the progress schedule, for sequencing, schedul- <br /> the Work which includes quantities and prices of ing, or progress of the Work nor interfere with or <br /> items which when added together equal the Contract relieve CONTRACTOR from CONTRACTOR's <br /> Price and subdivides the Work into component parts full responsibility therefor. <br /> in sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such 2. CONTRACTOR's schedule of Shop <br /> prices will include an appropriate amount of Drawing and Sample submittals will be acceptable <br /> overhead and profit applicable to each item of to ENGINEER if it provides a workable <br /> Work. arrangement for reviewing and processing the <br /> required submittals. <br /> Paragraph 2.05.0 has been deleted and replaced with a <br /> new paragraph. See the Supplementary Conditions. 3 . CONTRACTOR's schedule of values <br /> G r. .r.a..nee of Insuizance. Before any x efk at rho will be acceptable to ENGINEER as to form and <br /> Site is stai4ed, GONTR GTOn and 01AWER ,.h" ll each <br /> 00700 - 10 <br />