My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such other data, interpretations, opinions, or infor- <br /> mation. a. such condition must meet any one or <br /> more of the categories described in paragraph <br /> New Paragraphs 4.02.C, 4.02.13, and 4.02.E have been 4.03A; and <br /> + added. See the Supplementary Conditions. <br /> b. with respect to Work that is paid for on a <br /> 4.03 Differing Subsurface or Physical Conditions Unit Price Basis, any adjustment in Contract <br /> + Price will be subject to the provisions of para- <br /> A. Notice: If CONTRACTOR believes that any graphs 9.08 and 11 .03 . <br /> subsurface or physical condition at or contiguous to the Site <br /> that is uncovered or revealed either: 2. CONTRACTOR shall not be entitled to <br /> + any adjustment in the Contract Price or Contract <br /> 1 . is of such a nature as to establish that any Times if: <br /> "technical data" on which CONTRACTOR is <br /> + entitled to rely as provided in paragraph 4.02 is a. CONTRACTOR knew of the existence <br /> materially inaccurate; or of such conditions at the time CONTRACTOR <br /> made a final commitment to OWNER in respect <br /> + 2. is of such a nature as to require a change of Contract Price and Contract Times by the <br /> in the Contract Documents ; or submission of a Bid or becoming bound under a <br /> negotiated contract; or <br /> 3 . differs materially from that shown or <br /> + indicated in the Contract Documents; or b. the existence of such condition could <br /> reasonably have been discovered or revealed as a <br /> 4. is of an unusual nature, and differs result of any examination, investigation, explo- <br /> + materially from conditions ordinarily encountered ration, test, or study of the Site and contiguous <br /> and generally recognized as inherent in work of the areas required by the Bidding Requirements or <br /> character provided for in the Contract Documents; Contract Documents to be conducted by or for <br /> CONTRACTOR prior to CONTRACTOR's <br /> then CONTRACTOR shall, promptly after becoming aware making such final commitment; or <br /> thereof and before further disturbing the subsurface or <br /> physical conditions or perfomring any Work in connection c. CONTRACTOR failed to give the <br /> therewith (except in an emergency as required by paragraph written notice within the time and as required by <br /> 6. 16.A), notify OWNER and ENGINEER in writing about paragraph 4.03A. <br /> such condition. CONTRACTOR shall not further disturb <br /> such condition or perform any Work in connection Part of the second sentence of Paragraph 4.03.C.3 has <br /> + therewith (except as aforesaid) until receipt of written order been deleted. <br /> to do so. 3 . If OWNER and CONTRACTOR are <br /> unable to agree on entitlement to or on the amount <br /> + B. ENGINEER 's Review: After receipt of written or extent, if any, of any adjustment in the Contract <br /> notice as required by paragraph 4.03.A, ENGINEER will Price or Contract Times, or both, a Claim may be <br /> promptly review the pertinent condition, determine the made therefor as provided in paragraph 10.05. <br /> necessity of OWNER's obtaining additional exploration or However, OWNER, ENGINEER, and <br /> + tests with respect thereto, and advise OWNER in writing ENGINEER's Consultants shall not be liable to <br /> (with a copy to CONTRACTOR) of ENGINEER's findings CONTRACTOR for any claims, costs, losses, or <br /> and conclusions. damages (including but not limited to all fees and <br /> + charges of engineers, architects, attorneys, and other <br /> C. Possible Price and Times Adjustments professionals and all court or <br /> dispute resolution costs) sustained by <br /> 1 . The Contract Price or the Contract CONTRACTOR on or in connection with any other <br /> Times, or both, will be equitably adjusted to the project or anticipated project. <br /> extent that the existence of such differing subsurface <br /> or physical condition causes an increase or decrease 4 .04 Underground Facilities <br /> + in CONTRACTOR's cost of, or time required for, <br /> performance of the Work; subject, however, to the A. Shown or Indicated: The information and data <br /> following: shown or indicated in the Contract Documents with respect <br /> + <br /> ,� <br /> 00700 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.