My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillI ME iiiiiiiiiiiiiiiiiiiiiillillillillillillI III <br /> and 6.05 .B. ENGINEER will be the sole judge of accept- submit an acceptable replacement for the rejected <br /> ability. No "or-equal" or substitute will be ordered, Subcontractor, Supplier, or other individual or entity, and <br /> installed or utilized until ENGINEER's review is complete, the Contract Price will be adjusted by the difference in the <br /> which will be evidenced by either a Change Order for a cost occasioned by such replacement, and an appropriate <br /> substitute or an approved Shop Drawing for an "or equal." Change Order will be issued or Written Amendment signed. <br /> ENGINEER will advise CONTRACTOR in writing of any No acceptance by OWNER of any such Subcontractor, <br /> negative determination. Supplier, or other individual or entity, whether initially or as <br /> a replacement, shall constitute a waiver of any right of <br /> D. Special Guarantee: OWNER may require CON- OWNER or ENGINEER to reject defective Work. <br /> TRACTOR to furnish at CONTRACTOR's expense a <br /> special performance guarantee or other surety with respect C. CONTRACTOR shall be fully responsible to <br /> to any substitute. OWNER and ENGINEER for all acts and omissions of the <br /> Subcontractors, Suppliers, and other individuals or entities <br /> E. ENGINEER 's Cost Reimbursement: ENGINEER performing or furnishing any of the Work just as <br /> will record time required by ENGINEER and CONTRACTOR is responsible fir CONTRACTOR's own <br /> ENGINEER's Consultants in evaluating substitute proposed acts and omissions. Nothing in the Contract Documents <br /> or submitted by CONTRACTOR pursuant to paragraphs shall create for the benefit of any such Subcontractor, <br /> 6.05 .A.2 and 6.05.B and in making changes in the Contract Supplier, or other individual or entity any contractual <br /> Documents (or in the provisions of any other direct contract relationship between OWNER or ENGINEER and any such <br /> with OWNER for work on the Project) occasioned thereby. Subcontractor, Supplier or other individual or entity, nor <br /> Whether or not ENGINEER approves a substitute item so shall it create any obligation on the part of OWNER or <br /> proposed or submitted by CONTRACTOR, CON- ENGINEER to pay or to see to the payment of any moneys <br /> TRACTOR shall reimburse OWNER for the charges of due any such Subcontractor, Supplier, or other individual or <br /> ENGINEER and ENGINEER' s Consultants for evaluating entity except as may otherwise be required by Laws and <br /> each such proposed substitute. Regulations. <br /> F. CONTRACTOR 's Expense. CONTRACTOR shall A new sentence has been added at the end of Paragraph <br /> provide all data in support of any proposed substitute or 6.06.C. See the Supplementary Conditions. <br /> "or-equal" at CONTRACTOR's expense. <br /> D. CONTRACTOR shall be solely responsible for <br /> 6.06 Concerning Subcontractors, Suppliers, and Others scheduling and coordinating the Work of Subcontractors, <br /> Suppliers, and other individuals or entities performing or <br /> A. CONTRACTOR shall not employ any Subcon- furnishing any of the Work under a direct or indirect <br /> tractor, Supplier, or other individual or entity (including contract with CONTRACTOR. <br /> those acceptable to OWNER as indicated in paragraph <br /> 6.06.13), whether initially or as a replacement, against whom E. CONTRACTOR shall require all Subcontractors, <br /> OWNER may have reasonable objection. CONTRACTOR Suppliers, and such other individuals or entities performing <br /> shall not be required to employ any Subcontractor, Supplier, or furnishing any of the Work to „ormnunicate with ENGI- <br /> or other individual or entity to fiunish or perform any of the NEER through CONTRACTOR. <br /> Work against whom CONTRACTOR has reasonable <br /> objection. F. The divisions and sections of the Specifications <br /> and the identifications of any Drawings shall not control <br /> B. If the Supplementary Conditions require the CONTRACTOR in dividing the Work among Subcon- <br /> identity of certain Subcontractors, Suppliers, or other tractors or Suppliers or delineating the Work to be <br /> individuals or entities to be submitted to OWNER in performed by any specific trade. <br /> advance for acceptance by OWNER by a specified date <br /> prior to the Effective Date of the Agreement, and if G. All Work performed for CONTRACTOR by a <br /> CONTRACTOR has submitted a list thereof in accordance Subcontractor or Supplier will be pursuant to an appropriate <br /> with the Supplementary Conditions, OWNER 'S acceptance agreement between CONTRACTOR and the Subcontractor <br /> (either in writing or by failing to make written objection or Supplier which specifically binds the Subcontractor or <br /> thereto by the date indicated for acceptance or objection in Supplier to the applicable terms and conditions of the <br /> the Bidding Documents or the Contract Documents) of any Contract Documents for the benefit of OWNER and <br /> such Subcontractor, Supplier, or other individual or entity ENGINEER. Whenever any such agreement is with a <br /> so identified may be revoked on the basis of reasonable Subcontractor or Supplier who is listed as an additional <br /> objection after due investigation. CONTRACTOR shall insured on the property insurance provided in paragraph <br /> 00700 - 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.